地铁车站顶板(逆筑法)施工阶段抗裂研究
A Study on Crack Resistance of Subway Station Top Floor during Construction
-
摘要: 分析了施工阶段地铁车站顶板裂缝的成因,根据实测数据计算了监测段的温度应力。施工阶段水化热 不会引起地铁车站顶板开裂,设计类似结构时,可以不设施工后浇带。采用低热水泥或降低水泥用量是减少水 化热的关键。Abstract: The cause of subway station top floor cracking during construction is analyzed, and the tempera- ture stresses ofthe monitoringsection are computed usingthe practical test data. It is pointed outthat during construction the hydration heat will not cause the subway station top floor to crack, and that in designing structures of the same kind, it is unnecessary to design the after-pouring construction joint. On the other hand, using cement of low hydration heat or decreasing the amount of cement is important.
-
Key words:
- breaks /
- structures /
- hydration heat /
- temperature stress