萧甬二线工程软土路基 筑堤试验原位观测
In-Situ Observation of Embankment Experiments on Soft Soil Roadbed of Second Xiaoshan-Ningbo Railway
-
摘要: 对萧甬线增建二线软土路基采用插塑板、袋装砂井、土工布和粉喷桩4种加固方案的沉降量、侧向位移、 孔隙水压以及对既有线的影响进行了观测和分析.结果表明,粉喷桩加固对减小路基沉降量、侧向位移、孔隙水 压和对既有线影响等方面具有较大的优越性,是最佳的加固方案.Abstract: The settlement, lateral displacement and pore water pressure for four schemes to consolidate the soft soil roadbed of the second Xiaoshan-Ningbo railway and the effect on the existing railway were observed on site and analyzed. These consolidation schemes are plastic plank, sand well and fibred fabric and cement-mixed pile.The observational result shows that consolidation of cement- mixed piles has more advantages over the three other schemes in reducing the settlement, lateral displacement and the influence on the existing railway and improving pore water pressure and is the best scheme.
-
Key words:
- roadbed /
- soft soil /
- field test /
- in-situ observation /
- cement-mixed pile
点击查看大图
计量
- 文章访问数: 1486
- HTML全文浏览量: 66
- PDF下载量: 113
- 被引次数: 0