• ISSN 0258-2724
  • CN 51-1277/U
  • EI Compendex
  • Scopus
  • Indexed by Core Journals of China, Chinese S&T Journal Citation Reports
  • Chinese S&T Journal Citation Reports
  • Chinese Science Citation Database
Volume 27 Issue 2
Apr.  2014
Turn off MathJax
Article Contents
WANG Yuanqing, ZONG Liang, ZHANG Longying, JIA Ruihua, SHI Gang. Simulation of Construction Process of Loukouni Bridge in the Republic of Congo[J]. Journal of Southwest Jiaotong University, 2014, 27(2): 195-201. doi: 10.3969/j.issn.0258-2724.2014.02.002
Citation: WANG Yuanqing, ZONG Liang, ZHANG Longying, JIA Ruihua, SHI Gang. Simulation of Construction Process of Loukouni Bridge in the Republic of Congo[J]. Journal of Southwest Jiaotong University, 2014, 27(2): 195-201. doi: 10.3969/j.issn.0258-2724.2014.02.002

Simulation of Construction Process of Loukouni Bridge in the Republic of Congo

doi: 10.3969/j.issn.0258-2724.2014.02.002
  • Received Date: 05 May 2013
  • Publish Date: 25 Mar 2014
  • Loukouni bridge is a deck type arch bridge with box section and is a part of the second stage of the first national road project of the Republic of Congo. This bridge will be constructed with cable erecting equipment. To make sure its construction safety, three methods, including the zero moment method, the zero displacement method and the invariable cable method, were used to calculate the cable force of fastening cable and the pre-camber of main arch during the construction. Live and dead elements provided by the general FE (finite element) software ANSYS were utilized to simulate the construction of the bridge. The research result shows that both the zero displacement method and the invariable cable method can meet the construction demand in terms of the shape of the arch, the stress of arch section and the deformation of the arch. In the two methods, the invariable cable method is better and should be the first choice applied to the Loukouni bridge. The trial zero displacement method is a simple and effective way to obtain the cable force.

     

  • loading
  • 田仲初. 大跨度钢箱拱桥的施工控制关键技术与动力特性研究. 长沙:中南大学土木建筑学院, 2007.
    陈彦江, 付玉辉, 孙航. 灰色理论在钢管混凝土拱桥施工控制中的应用[J]. 哈尔滨工业大学学报, 2007, 39(4): 546-548. CHEN Yanjiang, FU Yuhui, SUN Hang. Application of grey system method in construction control of long-span concrete-filled steel-tube arch bridge[J]. Journal of Harbin Institute of Technology, 2007, 39(4): 546-548.
    张治成, 叶贵如, 王云峰. 大跨度拱桥拱肋线形调整中的扣索索力优化[J]. 工程力学, 2004, 21(6): 187-192. ZHANG Zhicheng, YE Guiru, WANG Yunfeng. Optimization of stayed-buckle cable forces during adjustment of the line-shape on long span bridge[J]. Engineering Mechanics, 2004, 21(6): 187-192.
    HE Xiongjun, SHEN Chenwu, CHEN Qiaosheng, et al. Adjustment of buckle-cable forces under cable hoisting construction of concrete-filled steel tubular arch bridges[J]. Journal of Wuhan Transportation University, 1999, 23(5): 575-578.
    AU F T K, WANG J J, LIU G D. Construction control of reinforced concrete arch bridges[J]. Journal of Bridge Engineering, 2002, 8(1): 39-45.
    GRANATA M F, MARGIOTTA P, RECUPERO A, et al. Partial elastic scheme method in cantilever construction of concrete arch bridges[J]. Journal of Bridge Engineering, 2013, 18(7): 663-672.
    王小成. 大跨度钢管混凝土拱桥拱肋吊装施工过程空间仿真计算. 武汉:武汉理工大学土木工程与建筑学院, 2006.
    DIMANDE A, PIMENTEL M, FLIX C, et al. Monitoring system for execution control applied to a steel arch footbridge[J]. Structure and Infrastructure Engineering, 2012, 8(3): 277-294.
    田仲初, 陈得良, 颜东煌, 等. 钢箱提篮拱桥施工控制的关键技术研究[J]. 中国公路学报, 2004, 17(3): 46-50. TIAN Zhongchu, CHEN Deliang, YAN Donghuang, et al. Study of key technology with construction control of steel box basket-handling arch bridge[J]. China Journal of Highway and Transport, 2004, 17(3): 46-50.
    王元清, 宗亮, 张龙英, 等. 考虑中欧规范差异的刚果(布)Loukouni大桥设计复核分析[J]. 铁道科学与工程学报, 2012, 9(5): 1-6. WANG Yuanqing, ZONG Liang, ZHANG Longying, et al. Design review on Loukouni bridge in the Republic of Congo considering the difference between Chinese code and Eurocode[J]. Journal of Railway Science and Engineering, 2012, 9(5): 1-6.
    中交第一公路工程局有限公司. JTG/T F502011 公路桥涵施工技术规范[S]. 北京:人民交通出版社, 2011.
    REDDY P, JAMSHID G, NEIL M H. Simulation of construction of cable-stayed bridges[J]. Journal of Bridge Engineering, 1999, 4(4): 249-257.
    TIAN Weifeng, ZHANG Liangliang, AYAD T S. Calculation of cable force and pre-camber for long-span rib arch bridge construction by unstressed state control method//Third International Conference on Trans-portation Engineering. Chengdu: ASCE, 2011: 2104-2109.
    李顺国. 大跨度钢管混凝土拱桥拱肋吊装过程几何非线性分析. 武汉:武汉理工大学土木工程与建筑学院, 2002.
    王新敏. ANSYS工程结构数值分析[M]. 北京:人民交通出版社, 2007: 291-293.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views(992) PDF downloads(571) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return