Citation: | WANG Yuanqing, ZONG Liang, ZHANG Longying, JIA Ruihua, SHI Gang. Simulation of Construction Process of Loukouni Bridge in the Republic of Congo[J]. Journal of Southwest Jiaotong University, 2014, 27(2): 195-201. doi: 10.3969/j.issn.0258-2724.2014.02.002 |
田仲初. 大跨度钢箱拱桥的施工控制关键技术与动力特性研究. 长沙:中南大学土木建筑学院, 2007.
|
陈彦江, 付玉辉, 孙航. 灰色理论在钢管混凝土拱桥施工控制中的应用[J]. 哈尔滨工业大学学报, 2007, 39(4): 546-548. CHEN Yanjiang, FU Yuhui, SUN Hang. Application of grey system method in construction control of long-span concrete-filled steel-tube arch bridge[J]. Journal of Harbin Institute of Technology, 2007, 39(4): 546-548.
|
张治成, 叶贵如, 王云峰. 大跨度拱桥拱肋线形调整中的扣索索力优化[J]. 工程力学, 2004, 21(6): 187-192. ZHANG Zhicheng, YE Guiru, WANG Yunfeng. Optimization of stayed-buckle cable forces during adjustment of the line-shape on long span bridge[J]. Engineering Mechanics, 2004, 21(6): 187-192.
|
HE Xiongjun, SHEN Chenwu, CHEN Qiaosheng, et al. Adjustment of buckle-cable forces under cable hoisting construction of concrete-filled steel tubular arch bridges[J]. Journal of Wuhan Transportation University, 1999, 23(5): 575-578.
|
AU F T K, WANG J J, LIU G D. Construction control of reinforced concrete arch bridges[J]. Journal of Bridge Engineering, 2002, 8(1): 39-45.
|
GRANATA M F, MARGIOTTA P, RECUPERO A, et al. Partial elastic scheme method in cantilever construction of concrete arch bridges[J]. Journal of Bridge Engineering, 2013, 18(7): 663-672.
|
王小成. 大跨度钢管混凝土拱桥拱肋吊装施工过程空间仿真计算. 武汉:武汉理工大学土木工程与建筑学院, 2006.
|
DIMANDE A, PIMENTEL M, FLIX C, et al. Monitoring system for execution control applied to a steel arch footbridge[J]. Structure and Infrastructure Engineering, 2012, 8(3): 277-294.
|
田仲初, 陈得良, 颜东煌, 等. 钢箱提篮拱桥施工控制的关键技术研究[J]. 中国公路学报, 2004, 17(3): 46-50. TIAN Zhongchu, CHEN Deliang, YAN Donghuang, et al. Study of key technology with construction control of steel box basket-handling arch bridge[J]. China Journal of Highway and Transport, 2004, 17(3): 46-50.
|
王元清, 宗亮, 张龙英, 等. 考虑中欧规范差异的刚果(布)Loukouni大桥设计复核分析[J]. 铁道科学与工程学报, 2012, 9(5): 1-6. WANG Yuanqing, ZONG Liang, ZHANG Longying, et al. Design review on Loukouni bridge in the Republic of Congo considering the difference between Chinese code and Eurocode[J]. Journal of Railway Science and Engineering, 2012, 9(5): 1-6.
|
中交第一公路工程局有限公司. JTG/T F502011 公路桥涵施工技术规范[S]. 北京:人民交通出版社, 2011.
|
REDDY P, JAMSHID G, NEIL M H. Simulation of construction of cable-stayed bridges[J]. Journal of Bridge Engineering, 1999, 4(4): 249-257.
|
TIAN Weifeng, ZHANG Liangliang, AYAD T S. Calculation of cable force and pre-camber for long-span rib arch bridge construction by unstressed state control method//Third International Conference on Trans-portation Engineering. Chengdu: ASCE, 2011: 2104-2109.
|
李顺国. 大跨度钢管混凝土拱桥拱肋吊装过程几何非线性分析. 武汉:武汉理工大学土木工程与建筑学院, 2002.
|
王新敏. ANSYS工程结构数值分析[M]. 北京:人民交通出版社, 2007: 291-293.
|