• ISSN 0258-2724
  • CN 51-1277/U
  • EI Compendex
  • Scopus 收录
  • 全国中文核心期刊
  • 中国科技论文统计源期刊
  • 中国科学引文数据库来源期刊

桩-土相互作用支护桩受力变形计算方法

李涛 江永华 朱连华 关辰龙

李涛, 江永华, 朱连华, 关辰龙. 桩-土相互作用支护桩受力变形计算方法[J]. 西南交通大学学报, 2016, 29(1): 14-21. doi: 10.3969/j.issn.0258-2724.2016.01.003
引用本文: 李涛, 江永华, 朱连华, 关辰龙. 桩-土相互作用支护桩受力变形计算方法[J]. 西南交通大学学报, 2016, 29(1): 14-21. doi: 10.3969/j.issn.0258-2724.2016.01.003
LI Tao, JIANG Yonghua, ZHU Lianhua, GUAN Chenlong. A Novel Method for Calculating Stress and Deformation of Supporting Pile Considering Pile-Soil Interaction[J]. Journal of Southwest Jiaotong University, 2016, 29(1): 14-21. doi: 10.3969/j.issn.0258-2724.2016.01.003
Citation: LI Tao, JIANG Yonghua, ZHU Lianhua, GUAN Chenlong. A Novel Method for Calculating Stress and Deformation of Supporting Pile Considering Pile-Soil Interaction[J]. Journal of Southwest Jiaotong University, 2016, 29(1): 14-21. doi: 10.3969/j.issn.0258-2724.2016.01.003

桩-土相互作用支护桩受力变形计算方法

doi: 10.3969/j.issn.0258-2724.2016.01.003
基金项目: 

国家自然科学基金重点项目(U1261212)

国家自然科学基金青年科学基金资助项目(51508556)

北京高等学校青年英才计划资助项目(YETP0944)

中央高校基本科研业务费专项资金资助项目(2009QL02)

详细信息
    作者简介:

    李涛(1981-),男,副教授,博士,硕士生导师,研究方向为城市地下工程,E-mail:litaocumtb@163.com

A Novel Method for Calculating Stress and Deformation of Supporting Pile Considering Pile-Soil Interaction

  • 摘要: 为研究桩-土非线性相互作用对深基坑支护结构内力与位移的影响,提出了一种桩-土相互作用支护桩受力变形计算的方法.该方法将基坑开挖面以上的桩体视为有限数量的弹性体,开挖面以下的桩体视为Winker地基梁,支撑结构为二力杆弹簧,并考虑支护桩和内支撑的变形协调,基于桩结构分段分坐标法和弹性地基梁法,推导出了考虑桩-土-内支撑共同作用的支护桩体挠曲微分方程.结合理论土压力,采用该方程计算获得了不同开挖深度的桩体水平位移和桩体弯矩,并与规范法、实测值进行比较.结果表明:本文方法计算得到的支护桩最大水平位移比规范法小15.2%,最大弯矩较规范法小26.6%,均与实测值更为相近.

     

  • 杨光华. 深基坑支护结构的实用计算方法及其应用[J]. 岩土力学,2004,25(12): 1885-1902. YANG Guanghua. Practical calculation method of retaining structures for deep excavations and its application[J]. Rock and Soil Mechanics, 2004, 25(12): 1885-1902.
    周景星,王洪瑾,虞石民,等. 基础工程[M]. 北京:清华大学出版社,1996: 169-194.
    夏永承,董道洋,胡敏云. 深基坑锚拉护壁桩的受力特性和土压力[J]. 西南交通大学学报,2000,35(2): 111-115. XIA Yongcheng, DONG Daoyang, HU Minyun. Behavior and earth pressure of the retaining piles with anchors for deep excavation[J]. Journal of Southwest Jiaotong University, 2000, 35(2): 111-115.
    李仁民,施占新,刘松玉,等. 弹性地基梁法和等值梁法进行基坑支护设计研究[J]. 西部探矿工程,2007(10): 17-19. LI Renmin, SHI Zhanxin, LIU Songyu, et al. Elastic foundation beam method and the equivalent beam method for the design of foundation pit[J]. West-China Exploration Engineering, 2007(10): 17-19.
    邓子胜. 深基坑支护结构-土非线性共同作用弹性地基反力法[J]. 土木工程学报,2006,39(4): 68-72. DENG Zisheng. An elastic subgradereaction method considering nonlinear inter action between protection-structure and soil for deep excavations[J]. China Civil Engineering Journal, 2006, 39(4): 68-72.
    李涛,刘波,陶龙光. 深基坑-高层建筑共同作用实例研究[J]. 中国矿业大学学报,2008,37(2): 241-245. LI Tao, LIU Bo, TAO Longguang. Interactions between deep excavations and nearby high-rise buildings[J]. Journal of China University of Mining Technology, 2008, 37(2): 241-245.
    东兆星,周国庆,齐燕军. 圆形深基坑中冻土帷幕变形规律试验研究[J]. 中国矿业大学学报,2007,36(2): 137-141. DONG Zhaoxing, ZHOU Guoqing, QI Yanjun. Experimental research on deformation features of frozen wall around circular deep foundation pit[J]. Journal of China University of Mining Technology, 2007, 36(2): 137-141.
    杨有海,武进. 杭州地铁秋涛路车站深基坑支护结构性状分析[J]. 岩土力学与工程学报,2008,27(增刊2): 3386-3392. YANG Youhai, WU Jin. Analysis of retaining structures for deep foundation pit of qiutao road station in Hangzhou metro[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(Sup.2): 3386-3392.
    横山幸满. 桩结构物的计算方法和计算实例[M]. 唐业清, 吴庆荪,译. 北京:中国铁道出版社,1984: 6-13.
    朱彦鹏,魏升华. 深基坑支护桩与土相互作用的研究[J]. 岩土力学,2010,31(9): 2840-2844. ZHU Yanpeng, WEI Shenghua. Research on interaction between deep excavation supporting pile and soil[J]. Rock and Soil Mechanics, 2010, 31(9): 2840-2844.
    陆新征,宋二祥,吉林,等. 某特深基坑考虑支护结构与土体共同作用的三维有限元分析[J]. 岩土工程学报,2003,25(4): 488-491. LU Xinzheng, SONG Erxiang, JI Lin, et al. 3-dimensional FEA for the interaction between supporting structure of excavation and soil in a very deep pit[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(4): 488-491.
    陈晓平,闫军. 深基坑支护结构的三维杆系有限元分析[J]. 岩土力学,2001,22(3): 258-261. CHEN Xiaoping, YAN Jun. 3D pole system FEM analysis for bracing structure of deep foundation pit[J]. Rock and Soil Mechanics, 2001, 22(3): 258-261.
    梁穑稼,徐伟,陈宇. 格形地下连续墙基坑施工阶段侧向变形[J]. 西南交通大学学报,2015,50(1): 150-155,172. LIANG Sejia, XU Wei, CHEN Yu. Lateral deformation of cellular diaphragm wall at excavation stage[J]. Journal of Southwest Jiaotong University, 2015, 50(1): 150-155, 172.
    龙驭球. 弹性地基梁的计算[M]. 北京:人民教育出版社,1981: 19-22.
    中国建筑科学研究院. JGJ120-2012 建筑基坑支护技术规程[S]. 北京:中国建筑工业出版社,2012.
    陈忠汉,黄书秩,程丽萍. 深基坑工程[M]. 北京:机械工业出版社,2003: 61-113.
  • 加载中
计量
  • 文章访问数:  1051
  • HTML全文浏览量:  97
  • PDF下载量:  472
  • 被引次数: 0
出版历程
  • 收稿日期:  2014-11-13
  • 刊出日期:  2016-01-25

目录

    /

    返回文章
    返回