摘要: 针对轨道电路分路不良的问题,提出一种基于多传感器的轨道区段占用解决方案.该方案利用红外对射、接近开关和测距3种传感器不同的安装方法来实现数据采集,基于D-S证据理论建立了轨道占用检测模型,并通过Petri网的轨道占用检测模型实现列车计轴,在上位机实现对轨道占用情况的判断,以此对铁路行车控制提供有效依据.分析表明,本文设计的轨道电路占用解决方案的危险侧失效概率达到10-7,MTBF(平均故障间隔时间)达到105 h,满足铁路应用的可靠性和安全性需求;与传统轨道电路相比,解决轨道区段占用问题的正确率提高了20%.Abstract: To handle the bad shunting of track circuit, a solution using multi-sensors was proposed to solve the track section occupancy. Different layouts of three types of sensors, i.e., the infrared sensor, proximity switch and distance measurement sensor, were used in data collection. Based on D-S evidence theory, track occupancy detection model was constructed. The Petri net model of detecting track section occupation operating at the lower computer was used to realize axis counting and examine track occupancy at upper monitor, which provides a basis for railway traffic control. Analysis shows that the wrong side failure rate of the proposed solution is 10-7, and that the MTBF (mean time between failure) reaches up to 105 h, which could meet the reliability and safety requirement of railway application. Compared with conventional track circuit, the correct rate of this solution dealing with track section occupancy is increased by 20%.
-
Key words:
- track circuit /
- bad shunting /
- axle counting /
- infrared ray sensor /
- proximity switch /
- distance measurement sensor
-
李铭,赵晔. 三点检查逻辑对区间轨道电路分路不良的防护研究 吴江娇,王亚菊. 客运专线列控中心对轨道电路分路不良的防护 [J]. 铁路通信信号工程技术,2012,9(3): 59-61. LI Ming, ZHAO Ye. Research of the released by checking three sections for bad shunting of track circuit 何成才,杨淘. CBTC系统中移动闭塞与后备模式追踪间隔研究 [J]. Railway Signalling Communication Engineering, 2012, 9(3): 59-61. 胡永生. 轨道电路分路不良整治方案研究 [J]. 北京交通大学学报,2008,32(3): 21-24. WU Jiangjiao, WANG Yaju. Preservation measures against track circuit defective shunting in train control center of dedicated passenger line 金学松,杜星,郭俊,等. 钢轨打磨技术研究进展 何贵洋,华泽玺. 轨道电路分路不良解决方案分析 [J]. Journal of Beijing Jiaotong University, 2008, 32(3): 21-24. 徐炳辉. 利用主动红外监测装置解决分路不良问题 [J].西南交通大学学报,2012,47(3): 446-450,457. HE Chengcai, YANG Tao. Comparison of headways in moving block and fallback modes for CBTC system 王剑,张辉,蔡伯根,等. 基于GNSS的轨道占用识别技术综述 KANDAGAL S B, VENKATRAMAN K. A modelling approach of robustness control for regulation systems with temporal and non temporal constraints through petri nets [J]. Journal of Southwest Jiaotong University, 2012, 47(3): 446-450,457. 林闯,王元卓,杨扬,等. 基于随机Petri网的网络可信赖性分析方法研究 康杰,李良. 基于Petri网的CONW IP控制系统的建模与仿真 [J]. 铁道通信信号,2008,44(5): 24-26. HU Yongsheng. Research of the improvement plan on bad shunting of track circuit 袁崇义. Petri网 [J]. Railway Signalling Communication, 2008, 44(5): 24-26. 符萌,郭进,王小敏,等. 铁路信号设备可靠性研究 European Committee for Electronical technical Standardization. EN50126 Railway applications-the specification and demonstration of reliability, availability, maintainability and safety (RAMS) [J]. 西南交通大学学报,2010,45(1): 1-11. JIN Xuesong, DU Xing, GUO Jun, et al. State of arts of research on rail grinding [J]. Journal of Southwest Jiaotong University, 2010, 45(1): 1-11. IEC. BS EN 61508-1:2010 Functional safety of electrical/electronic/programmable electronic safety-related systems [J]. 铁路计算机应用,2012,21(1): 46-48. HE Guiyang, HUA Zexi. State of solution analys is for defective shunting of track circuit [J]. Railway Computer Application, 2012, 21(1): 46-48. [J]. 铁道通信信号,2007,43(5): 9-10. XU Binghui. The measurement of solve track circuit bad shunting by active infrared monitoring device [J]. Railway Signalling Communication, 2007, 43(5): 9-10. [J]. 铁道学报,2010,32(2): 93-97. WANG Jian, ZHANG Hui, CAI Bogen, et al. A survey of track occupancy recognition technology based on GNSS [J]. Journal of the China Railway Society, 2010, 32(2): 93-97. [J]. Journal of Networks, 2012, 7(4): 746-753. [J]. 电子学报,2006,34(2): 322-332. LIN Chuang, WANG Yuanzhuo, YANG Yang, et al. Research on network dependability analysis methods based on stochastic petri net [J]. Acta Electron ICA Sinica, 2006, 34(2): 322-332. [J]. 西南交通大学学报,2009,44(4):620-624. KANG Jie, LI Liang. Modeling and simulation of CONWIP systems based on petri net [J]. Journal of Southwest Jiaotong University, 2009, 44(4): 620-624. [M]. 南京:东南大学出版社,1989: 11-30. [J]. 中国铁路,2009(12): 56-59. FU Meng, GUO Jin, WANG Xiaomin, et al. Research on reliability of railway signal equipment [J]. Chinese Railways, 2009(12): 56-59. [S]. Brussels: CENELEC, 2001. [S]. Geneva: IEC, 1997.
点击查看大图
计量
- 文章访问数: 831
- HTML全文浏览量: 77
- PDF下载量: 307
- 被引次数: 0