基于实用的技术站直通列车接续方案 计算方法研究
Study on Optimization of Through Goods Train’s Linkage at Technical Station
-
摘要: 编制网络列车运行图的很重要的一环就是处理直通列车在技术站的接续与 始发列车的合理协调问题。通过分析技术站直通列车接续与始发列车的相互关系, 建立优化该问题的数学模型,并将其转化为网络流模型,用最小费用最大流方法求 解。实际应用表明,该算法能够有效地解决技术站直通列车接续问题。Abstract: By analyzing the relationship between the through goods train’s linkage and the equilibriumof departure trains at technical stations, a network flow model for linking through goods train is set up.This problem can be solved by using the special algorithm for minimal cost maximum flow. Its application shows that it is effective for optimizing the through goods train s linkage and the equilibriumof the departing train at technical station.
-
Key words:
- train graph /
- network flows /
- model building /
- technical stations /
- through goods train s linkage
点击查看大图
计量
- 文章访问数: 1521
- HTML全文浏览量: 73
- PDF下载量: 199
- 被引次数: 0