• ISSN 0258-2724
  • CN 51-1277/U
  • EI Compendex
  • Scopus 收录
  • 全国中文核心期刊
  • 中国科技论文统计源期刊
  • 中国科学引文数据库来源期刊

唐家山堰塞坝“9·24”泥石流堵江及溃决模式

胡卸文 吕小平 黄润秋 任晓明 汪雪瑞 刘娟

胡卸文, 吕小平, 黄润秋, 任晓明, 汪雪瑞, 刘娟, . 唐家山堰塞坝“9·24”泥石流堵江及溃决模式[J]. 西南交通大学学报, 2009, 22(3): 312-320,326.
引用本文: 胡卸文, 吕小平, 黄润秋, 任晓明, 汪雪瑞, 刘娟, . 唐家山堰塞坝“9·24”泥石流堵江及溃决模式[J]. 西南交通大学学报, 2009, 22(3): 312-320,326.
HU Xiewen, LÜ, Xiaoping, HUANG Runqiu, REN Xiaoming, WANG Xuerui, LIU Juan. Analyses of River-Blocking and Breaking Mode of '9·24' Debris Flow near Tangjiashan Barrier Dam[J]. Journal of Southwest Jiaotong University, 2009, 22(3): 312-320,326.
Citation: HU Xiewen, LÜ, Xiaoping, HUANG Runqiu, REN Xiaoming, WANG Xuerui, LIU Juan. Analyses of River-Blocking and Breaking Mode of "9·24" Debris Flow near Tangjiashan Barrier Dam[J]. Journal of Southwest Jiaotong University, 2009, 22(3): 312-320,326.

唐家山堰塞坝“9·24”泥石流堵江及溃决模式

基金项目: 

国家自然科学基金资助项目(40772175,40841025)

地质灾害防治与地质灾害保护国家重点实验室“科技减灾、重建家园”开放基金资助项目(DZKJ-08012)

西南交通大学科学研究基金资助(2008-A01)

详细信息
    作者简介:

    胡卸文(1963- ),男,教授,博士,博士生导师,主要从事工程地质、环境地质方面的研究,E-mail:huxiewen@163.com

Analyses of River-Blocking and Breaking Mode of "9·24" Debris Flow near Tangjiashan Barrier Dam

  • 摘要: "5·12"汶川地震导致唐家山高速滑坡堵江,形成唐家山堰塞湖.经过6月10日正常泄流后,堰塞坝体右岸还存在唐家山残留山体稳定性以及附近大水沟、小水沟泥石流等潜在危害.现场实地调查显示,受地震影响,大水沟、小水沟及无名沟沟域内崩塌和滑坡发育,形成了极为丰富的松散物源,具备发生坡面和沟谷泥石流的所有条件,也成为唐家山堰塞湖成功泄水后,仍对堰塞湖正常利用起控制作用的严重地质灾害隐患点之一,"6·14"和"9·24"2次大规模泥石流又导致通口河分别堵江断流4和17h.在查明唐家山堰塞体右岸3条冲沟内松散物源分布及稳定性的基础上,重点结合"9·24"泥石流发育状况,对大水沟、小水沟和无名沟泥石流的发育特征及其动力学特性,尤其是在不同降雨频率下一次冲出泥石流时唐家山堰塞坝体泄水槽的堵江状况及溃决模式进行了系统分析.分析结果表明:3条冲沟形成泥石流堵江后,一次全溃决的可能性很小,其溃决模式为"扇缘部位首先过流→水流挤压左岸并淘刷左岸堰塞体→逐级冲开堆积扇".这一模式对震后地震灾区泥石流的研究具有指导和借鉴意义.

     

  • 胡卸文,吕小平,黄润秋,等.唐家山堰寨湖大水沟泥石流发育特征及堵江危害性评价[J].岩石力学与工程学报,2009,28(4):850-858.HU Xiewen,L(U) Xiaoping,HUANG Runqiu,et al.Developmental features and evaluation of blocking dangers of Dashui ditch debris flow in Tangjiashan dammed lake[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(4):850-858.[2] 胡卸文,黄润秋,施裕兵,等.唐家山滑坡堵江机制及堰塞坝溃坝模式分析[J].岩石力学与工程学报,2009,28(1):181-189HU Xiewen.HUANG Runqiu,SHI Yubing,et al.Analysis on blocking river mechanism of Tangjiashan landslide and dam-breaking mode of its barrier dam[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(1):181-189.[3] 唐兴邦.中国泥石流[M].北京:商务印书馆,2000:246-295.[4] 陈洪凯,唐春梅,陈野鹰.公路泥石流研究及治理[M].人民交通出版社,2004:47-58.[5] 谢洪,钟敦伦,韦方强.我国山区城镇泥石流灾害及其成因[J].山地学报,2006,24(1):79-87.XIE Hong,ZHONG Dunlun,WEI Fangqiang.Debris flow hazards and their formation causes in mountain urban area of China[J].Journal of Mountain Science,2006,24(1):79-87.[6] HUNGR O.Analysis of debris flow surges using the theory of uniformly progressive flow[J].Earth Surface Processes and Landforms,2000,25:483-495.[7] IVEILSON M,RCOSTN E J,LAHUSEN G R.Large-scale debris-flow flume becomes operational in Oregon[C]∥Landslide News.[S.l.] :[S.n.] ,1993:29-30.[8] TAMOTSU T.Debris flow[M].Rotterdam:A.A.Balkma,1991:26-89.[9] 张金山,沈兴菊,谢洪.泥石流堵河影响因素研究--以岷江上游为例[J].灾害学,2007,22(2):82-86.ZHANG Jinshan,SHEN Xingju,XIE Hong.Study on factors affecting the fiver-blocking due to debris-flow in the upper reaches of Minjiang River[J].Journal of Catastrophology,2007,22(2):82-86.[10] 刘希林,唐川.泥石流危险性评价[M].北京:科学出版社,1995:84-91.[11] 王裕宜,胡凯衡.泥石流体的流变和冲淤特征及其与危险度的关系[J].自然灾害学报,2007,16(1):17-22.WANG Yuyi,HU Kaiheng.Relationship between rheology/erosion-deposit properties of debris flow and its hazard degree[J].Journal of Natural Disasters,2007,16(1):17-22.
  • 加载中
计量
  • 文章访问数:  1682
  • HTML全文浏览量:  67
  • PDF下载量:  324
  • 被引次数: 0
出版历程
  • 收稿日期:  2009-04-13
  • 刊出日期:  2009-06-20

目录

    /

    返回文章
    返回