Adjustment Method for Train Break-up and Make-up Sequence in Railway Technical Station
-
摘要: 在综合考虑技术站运输生产实际情况、调车机车能力限制和到发列车车流接续关系的基础上,提出了技术站列车解编顺序的调整方法.当前一列出发列车的待编时间长于或等于后一列的编组作业时间,且前一列的编组最晚开始时刻晚于或等于后一列的编组最早开始时刻时,可调整相邻列车编组顺序.当后一列到达列车的待解时间长于或等于前一列的解体作业时间,且后一列的解体最早结束时刻早于或等于前一列的解体最晚结束时刻时,可调整相邻列车解体顺序.上述规则可推广到跨列车解编顺序的调整.Abstract: Based on a comprehensive analysis of the break-up and make-up practices,the capacity limit of the shunting locomotives and the relationship between the arrival and departure wagons in a railway technical station,an adjustment method for train break-up and make-up sequence was proposed. When the time for a departure train to wait for make-up is longer than or equal to the make-up time for the one following it,and its latest make-up start time is later than or equal to the earliest make-up start time for the one following it,the make-up sequence between these two trains can be adjusted. When the time for a arrival train to wait for break-up is longer than or equal to the break-up time for the one before it,and its earliest break-up completion time is earlier than or equal to the latest break-up completion time for the one before it,the break-up sequence between these two trains can be adjusted. This method could be extended to adjustment of break-up and make-up sequences among several arrival and departure trains.
-
Key words:
- technical station /
- wagon-flow allocation /
- break-up /
- make-up /
- adjustment
-
何世伟,宋瑞,朱松年.编组站阶段计划解编作业优化模型及算法[J].铁道学报,1997,19(3):1-8.HE Shiwei,SONG Rui,ZHU Songnian.Optimal model and algorithm on stage plan of sorting and marshalling operation for marshalling station[J].Journal of the China Railway Society,1997,19(3):1-8.[2] 王慈光.运输模型及优化[M].北京:中国铁道出版社,2004:37-92.[3] 薛锋,王慈光.编组站列车编组顺序的调整方法[J].铁道学报,2007,29(4):1-5.XUE Feng,WANG Ciguang.The adjustment method for train classification sequence in marshalling station[J].Journal of the China Railway Society,2007,29(4):1-5.[4] 王明慧,赵强.编组站智能调度系统阶段计划优化模型及算法研究[J].铁道学报,2005,27(6):1-9.WANG Minghui,ZHAO Qiang.Optimal model and algorithm of stage plan of intelligent dispatching system for marshalling stations[J].Journal of the China Railway Society,2005,27(6):1-9.[5] 王正彬,杜文,吴柏青,等.基于解编顺序的阶段计划车流推算模型及算法[J].西南交通大学学报,2008,43(1):91-95.WANG Zhengbin,DU Wen,WU Baiqing,et al.Model and algorithm for estimation of wagon flow of stage operating plan based on break-up and make-up sequences[J].Journal of Southwest Jiaotong University,2008,43(1):91-95.
点击查看大图
计量
- 文章访问数: 1350
- HTML全文浏览量: 76
- PDF下载量: 282
- 被引次数: 0