Multi-period Programming Approach for Optimal Design of Manufacturing/Remanufacturing Logistics Network
-
摘要: 建立了多周期、有能力限制、反映资金时间价值、正逆向物流集成运作的物流网络优化设计的混合整数非线性规划模型,以确定制造/再制造混合系统中不同周期的各种物流设施的运营位置、数量及其相应的物流量分配.模型的目标是使计划期内的系统总费用最小.设计了求解该模型的混合遗传算法.通过算例验证了模型及其算法的有效性.Abstract: A mixed integer non-linear programming model was proposed for optimal design of manufacturing/remanufacturing(M/R) logistics network to determine the site and number of the facilities in different periods.In the model,multiple periods,capacities of facilities and time value of capital are taken into account,and forward/reverse logistics is integrated.The objective of the model is to minimize the total cost of the M/R logistics network in all the periods.A hybrid genetic algorithm for solution of the proposed model was presented.A numerical example verifies the validity of the model and the algorithm.
-
Key words:
- remanufacture /
- logistics network /
- hybrid genetic algorithm /
- optimal design /
- multi-period programming
-
FLEISCHMANN M,KRIKKE H R,DEKKER R,et al.A characterization of logistics networks for product recovery[J].Omega,2000,28(6):653-666.[2] 达庆利,黄祖庆,张钦.逆向物流系统结构研究的现状及展望[J].中国管理科学,2004,12(1):131-138.DA Qingli,HUANG Zuqing,ZHANG Qin.Current and future studies on structure of the reverse logistics system:a review[J].Chinese Journal of Management Science,2004,12(1):131-138.[3] JAYARAMAN V,GUIDE V D R,SRIVASTAVA R.A closed-loop logistics model for remanufacturing[J].Journal of the Operational Research Society,1999,50(5):497-508.[4] 代颖,马祖军.基于现值法的制造/再制造集成物流网络设计[J].西南交通大学学报,2007,42(2):249-254.DAI Ying,MA Zujun.Integrated logistics network design for hybrid manufacturing/remanufacturing systems based on present worth method[J].Journal of Southwest Jiaotong University,2007,42(2):249-254.[5] 马祖军,代颖.基于稳健优化的制造/再制造集成物流网络设计[J].西南交通大学学报,2006,41(5):614-619.MA Zujun,DAI Ying.Robust optimization-based integrated logistics network design for hybrid manufacturing/ remanufacturing Systems[J].Journal of Southwest Jiaotong University,2006,41 (5):614-619.[6] 顾巧论,季建华.再制造/制造系统集成物流网络模糊机会约束规划模型[J].控制理论与应用,2005,22(6):889-894.GU Qiaolun,JI Jianhua.Fuzzy chance-constrained programming model for the integrated logistics network of remanufacturing/manufacturing system[J].Control Theory and Application,2005,22(6):889-894.[7] KRARUP J,PRUZAN P.The sample plant locations problem:survey and synthesis[J].European Journal of Operational Research,1983,12(1):36-81.[8] 雷英杰,张善文,李续武,等.Matlab遗传算法工具箱及其应用[M].西安:西安电子科技大学出版社,2005:45-145.
点击查看大图
计量
- 文章访问数: 1830
- HTML全文浏览量: 77
- PDF下载量: 518
- 被引次数: 0