Model Test of Cantilever Casting Construction of Reinforced Concrete Arch Bridge
-
摘要: 为验证钢筋混凝土拱桥悬臂浇注施工工艺的可行性和安全性,以白沙沟1#大桥为工程背景,进行了悬臂浇注施工全过程模型试验;测试了拱圈变形、控制断面应力和扣索索力,并与有限元法计算结果进行了比较,二者基本相符.结果表明,拱圈在施工过程中是安全的,钢筋混凝土拱桥悬臂浇注施工工艺可行.Abstract: In order to demonstrate the feasibility of the construction technique of cantilever casting of a reinforced concrete arch bridge and the rationality of cable force adjustment and construction control,a model test of cantilever casting construction was made by taking the No.1 Baishagou bridge as project background.The displacement of model arch,the stress of control sections and the force of cables were tested.In addition,the test results were compared with calculated results based on the FEM(finite element method),showing reasonable agreement.The research results show that the model arch is safe during the construction,the construction technique of cantilever casting of reinforced concrete arch bridges is feasible,and the method of cable force optimization and adjustment is reasonable.
-
雷俊卿.桥梁悬臂施工与设计[M].北京:人民交通出版社,1999:216-219.[2] MARSEL F.The construction of large-span concrete arch bridges with cantilevering method using temporary cable-stays[C]//Proceedings of the International Conference on Bridge.Croatia:Croatian Society of Structural Engineering,2006:775-783.[3] 戴震番.克尔克桥的大跨度混凝土拱桥悬臂法施工[J].世界桥梁,1982(4):59-61.[4] 范瑛,梅利芳.日本富士川混凝土拱桥的设计与施工[J].世界桥梁,2002(2):14-17.[5] 孙玲.钢筋混凝土拱桥悬臂现浇施工控制分析[J].铁道建筑,2004(11):26-27.SUN Ling.Study on the control of reinforced concrete arch bridge constructed cantilever cast[J].Railway Engineering,2004 (11):26-27.[6] 刘万忠.悬臂拼装钢筋混凝土拱桥的施工控制[D].长沙:湖南大学土木工程学院,2001:21-35.[7] AU F T K,WANG Jiejun,LIU Gangdong.Construction control of reinforced concrete arch bridges[J].Journal of Bridge Engineering,2003,8(1):39-45.
点击查看大图
计量
- 文章访问数: 1881
- HTML全文浏览量: 85
- PDF下载量: 310
- 被引次数: 0