Redistribution of Longitudinal Shear Force on Interface of Steel-Concrete Composite Beams
-
摘要: 以受均布荷载作用的简支组合梁为对象,研究了栓钉等柔性连接件塑性变形引起的纵向剪力重分布.根据连接件的受力状态,将界面受力全过程划分为弹性阶段、弹塑性阶段和破坏阶段,建立了相应的剪力重分布简化模型,并导出了界面纵向剪力和轴向力的计算公式.研究表明:考虑纵向剪力重分布时,在荷载较小的情况下,轴向力随荷载增大呈线性关系增大;当荷载较大时,轴向力随荷载增大呈非线性关系增大,最后趋于稳定.Abstract: By taking a simply supported composite beam under uniformly distributed load as an example,the redistribution of longitudinal shear force,induced by the plastic deformation of flexible connectors such as studs,was investigated.Based on the actual working condition of the connectors,the mechanical full-range of the interface of a steel-concrete composite beam was divided into elastic,elasto-plastic and failure stages.Simplified analytical models were established for every stage and corresponding formulae for calculating longitudinal shear force and axial force were derived.The research shows that axial force increases linearly with the increase of load when the redistribution is taken into account and load is less;then with the growth of load,the increasing is non-linear;lastly,it trends to be unchanged.
-
Key words:
- composite beam /
- longitudinal shear-force redistribution /
- axial force /
- shear connector
-
聂建国,卫军.剪力连接件在钢-混凝土组合梁中的实际工作性能[J].郑州工学院学报,1991,12(4):44-47.NIE Jianguo,WEI Jun.Real behaviour of shear connectors in composite steel-concrete beams[J].Journal of Zhengzhou Institute of Technology,1991,12(4):44-47.[2] Velendanda M R,Hosain M U.Behaviour of perfobond rib shear connector:push-out tests[J].Canadian Journal of Civil Engineering,1992,19(1):1-10.[3] 聂建国,沈聚敏,袁彦声,等.钢-混凝土组合梁中剪力连接件实际承载力的研究[J].建筑结构学报,1996,17(2):21-29.NIE Jianguo,SHEN Jumin,YUAN Yansheng,et al.Experiment and analysis of actual shear capacity of shear connectors in composite steel-concrete beams[J].Journal of Building Structures,1996,17 (2):21-29.[4] 山寺德明,伊東昇,森河久.鶴見航路橋の設計概要(下)[J].橋梁と基礎,1993,2:23-32.[5] 时为民,江世永,赵文斌.组合板结合面水平剪力的计算[J].四川建筑科学研究,2000,26(3):12-13.SHI Weimin,JIANG Shiyong,ZHAO Wenbin.The calculation of horizontal shear between steel and concrete for composite slab[J].Building Science Research of Sichuan,2000,26 (3):12-13.[6] JASIM N A.Deflections of partially composite beams with linear connector density[J].Journal of Constructional Steel Research,1999(49):241-254.[7] 孙文彬.部分剪力连接钢-混凝土组合梁的滑移及曲率分析[J].力学与实践,2001,23(6):44-47.SUN Wenbin.Study on slip and curvature of the steel-concrete composite beams with partial shear connection[J].Mechanics and Practice,2001,23(6):44-47.[8] 赵鸿铁.钢与混凝土组合结构[M].北京:科学出版社,2001:30-32,75-76.[9] European Committee for Standardization.Eurocode 4 Design of composite steel and concrete structures-Part 2:Composite bridges[S].Brussels:[s.n.],1994.[10] 中华人民共和国建设部.GB 50017-2003钢结构设计规范[S].北京:中国计划出版社,2003.[11] 胡夏闽.欧洲规范4钢-混凝土组合梁设计方法(7)--剪力连接件设计[J].工业建筑,1996,26(3):46-51,57.HU Xiamin.Design method of Eurocode 4 for steel-concrete composite beams (7)-shear connection design in beams[J].Industrial Construction,1996,26(3):46-51,57.
点击查看大图
计量
- 文章访问数: 1443
- HTML全文浏览量: 68
- PDF下载量: 336
- 被引次数: 0