准高速客运专线轨道梁施工阶段的徐变性能
Creep Behavior ofQuasi-high-speed Dedicated Passenger Railway Track G irders during Construction
-
摘要: 以秦沈客运专线轨道梁为原型,设计了4根1∶5大尺度T型试验梁,对其在施工过程中的徐变变形进行 了试验研究,重点考察了混凝土种类及预应力筋张拉方式等因素对轨道梁徐变变形的影响.用大型商用软件 Sofistik对试验梁在施工阶段的徐变变形进行了时随全过程分析,计算结果与试验值的差值在10%以内.在此基 础上,提出了考虑混凝土种类、预应力筋张拉方式以及钢筋配筋率的徐变变形设计建议.研究结果为准高速客运 专线轨道梁设计和徐变变形控制提供了试验依据.Abstract: Four large scaleT-beamswith a geometricalproportion of1∶5 weremade to simulate track girders of theQinhuangdao-Shenyang dedicated passenger railway. Their creep deformations during the construction were investigated experimentally. The research laid emphasis upon the effects of types of concrete and tensioningmeasures ofprestressed steelbaron the creep deformation. Moreover, program Sofistikwas used in the time-dependent full-range analysis of theT-beams during the construction, the errorbetween calculated and experimental results being less than 10%. Based on the above research, design suggestions taking the typesofconcrete, the tensioningmeasuresofprestressed steelbarand the rate ofreinforcement into accountwere given. The research results are useful to the design ofdedicated passenger railway track girders and the effective control of creep deformation.
点击查看大图
计量
- 文章访问数: 1600
- HTML全文浏览量: 73
- PDF下载量: 342
- 被引次数: 0