摘要: 针对100~400 m中小跨度的自锚式悬索桥,提出了一种先架缆后挂梁的设计施工方案.计算了施工过 程中墩顶必须承受的最大水平拉力,分析了桥墩尺寸、临时固结和稳定性等关键问题.结果表明,在中小跨度范 围内,墩顶最大水平力可以由墩来承受,从而能够克服目前自锚式悬索桥“先梁后缆”施工的弊端.Abstract: To expand the application range of self-anchored suspension bridges, a novel construction methodwas brought up for self-anchored suspension bridges with a short span ranging from 100 to 400 m. It is called as“erecting cable before constructing girder”(ECBCG) constructionmethod and means that in the construction of a self-anchored suspension bridge the girder is constructed after the cable has been erected. Themaximum horizontal force that the piermustendurewas investigated, and some key problems, such as the size of the pier, the temporary join and the stabilization during construction, were discussed. The results show that the horizontal force can be acceptable for this type ofbridgewithin a certain range ofspan for thismethod to overcome the shortcoming of the construction method of“constructing girderbefore erecting cable”.
点击查看大图
计量
- 文章访问数: 1620
- HTML全文浏览量: 59
- PDF下载量: 135
- 被引次数: 0