Citation: | Zhu Jianmei. Study on Optimization of Through Goods Train’s Linkage at Technical Station[J]. Journal of Southwest Jiaotong University, 1999, 12(3): 365-368. |
[1] | ZHOU Wenliang, LI Peng, TIAN Junli, DENG Lianbo. Optimization of Train Timetable for Intercity Railway Based on Coordinated Operation of Multi-periodic Trains[J]. Journal of Southwest Jiaotong University, 2019, 54(4): 831-839. doi: 10.3969/j.issn.0258-2724.20170153 |
[2] | ZHANG Xiaobing, NI Shaoquan, PAN Jinshan. Optimization of Train Diagram Structure for High-Speed Railway[J]. Journal of Southwest Jiaotong University, 2016, 29(5): 938-943. doi: 10.3969/j.issn.0258-2724.2016.05.017 |
[3] | CHEN Dong, PENG Qiyuan, LI Yonghui. Simulation of Effect of Train Arrival Delay on Wagon Flow Connection at Technical Stations[J]. Journal of Southwest Jiaotong University, 2014, 27(6): 1108-1115. doi: 10.3969/j.issn.0258-2724.2014.06.026 |
[4] | ZHAO Jun, PENG Qiyuan, WEN Chao, XU Jin. Local Neighborhood Search Algorithm for Generalized Dynamic Wagon-Flow Allocation of Railway Technical Stations[J]. Journal of Southwest Jiaotong University, 2010, 23(3): 486-492. doi: 10. 3969/ j. issn. 0258-2724. |
[5] | PENG Qiyuan, ZHAO Jun. Adjustment Method for Train Break-up and Make-up Sequence in Railway Technical Station[J]. Journal of Southwest Jiaotong University, 2009, 22(3): 385-391. |
[6] | NIShao-quan, L Hong-xia, YANGMing-lun. Research on Design of Train Diagram-Making System of Railways in China[J]. Journal of Southwest Jiaotong University, 2003, 16(3): 332-335. |
[7] | LI Ying-hong, WUShi-gui, PENG Qi-yuan. Network Model and Algorithm for Freight Train Marshalling Plan[J]. Journal of Southwest Jiaotong University, 2002, 15(1): 68-71. |
[8] | NIShao-quan, L Hong-xia, LIUJi-yong. Design and Implementation of an Adjusting System of Computerized Train Graph Systems[J]. Journal of Southwest Jiaotong University, 2001, 14(3): 240-244. |
[9] | YAN Yu-song, ZHUSong-nian, DUWen. Network Flow Models for Organization of Transship Trains in Railway Terminals[J]. Journal of Southwest Jiaotong University, 2001, 14(2): 117-120. |
[10] | ZHANG Yu-cheng, LUhong-xia, WANG Bao-jie. The Analysis and Construction of Train Routine Based on Graphics Theory[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 273-276. |
[11] | ZHAO Qiang. Optimal Model and Algorithm for Feasibility of Station Arrival-Departure Requirement of Train Operation Plan[J]. Journal of Southwest Jiaotong University, 2000, 13(2): 196-200. |
[12] | SHUAIBin, QINGXue-jiang. The Frame Design of Making Train Diagram System with Computer Based on OOP[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 259-263. |
[13] | XIQing. Layout on Distributed Database System for Programming Train Diagram by Computer[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 264-267. |
[14] | PENG Qi-yuan, WANGJun, CUIXian-bo. Design on the Access to Distributed Database of the Network Train Diagram System[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 268-272. |
[15] | Xu Ling, ChaiJian, WangJinnuo. A Study on the Data Structure of Feature-Based Modeling[J]. Journal of Southwest Jiaotong University, 1999, 12(2): 174-179. |