• ISSN 0258-2724
  • CN 51-1277/U
  • EI Compendex
  • Scopus
  • Indexed by Core Journals of China, Chinese S&T Journal Citation Reports
  • Chinese S&T Journal Citation Reports
  • Chinese Science Citation Database
Volume 22 Issue 3
Jun.  2009
Turn off MathJax
Article Contents
PENG Qiyuan, ZHAO Jun. Adjustment Method for Train Break-up and Make-up Sequence in Railway Technical Station[J]. Journal of Southwest Jiaotong University, 2009, 22(3): 385-391.
Citation: PENG Qiyuan, ZHAO Jun. Adjustment Method for Train Break-up and Make-up Sequence in Railway Technical Station[J]. Journal of Southwest Jiaotong University, 2009, 22(3): 385-391.

Adjustment Method for Train Break-up and Make-up Sequence in Railway Technical Station

  • Received Date: 21 Nov 2008
  • Publish Date: 20 Jun 2009
  • Based on a comprehensive analysis of the break-up and make-up practices,the capacity limit of the shunting locomotives and the relationship between the arrival and departure wagons in a railway technical station,an adjustment method for train break-up and make-up sequence was proposed. When the time for a departure train to wait for make-up is longer than or equal to the make-up time for the one following it,and its latest make-up start time is later than or equal to the earliest make-up start time for the one following it,the make-up sequence between these two trains can be adjusted. When the time for a arrival train to wait for break-up is longer than or equal to the break-up time for the one before it,and its earliest break-up completion time is earlier than or equal to the latest break-up completion time for the one before it,the break-up sequence between these two trains can be adjusted. This method could be extended to adjustment of break-up and make-up sequences among several arrival and departure trains.

     

  • loading
  • 何世伟,宋瑞,朱松年.编组站阶段计划解编作业优化模型及算法[J].铁道学报,1997,19(3):1-8.HE Shiwei,SONG Rui,ZHU Songnian.Optimal model and algorithm on stage plan of sorting and marshalling operation for marshalling station[J].Journal of the China Railway Society,1997,19(3):1-8.[2] 王慈光.运输模型及优化[M].北京:中国铁道出版社,2004:37-92.[3] 薛锋,王慈光.编组站列车编组顺序的调整方法[J].铁道学报,2007,29(4):1-5.XUE Feng,WANG Ciguang.The adjustment method for train classification sequence in marshalling station[J].Journal of the China Railway Society,2007,29(4):1-5.[4] 王明慧,赵强.编组站智能调度系统阶段计划优化模型及算法研究[J].铁道学报,2005,27(6):1-9.WANG Minghui,ZHAO Qiang.Optimal model and algorithm of stage plan of intelligent dispatching system for marshalling stations[J].Journal of the China Railway Society,2005,27(6):1-9.[5] 王正彬,杜文,吴柏青,等.基于解编顺序的阶段计划车流推算模型及算法[J].西南交通大学学报,2008,43(1):91-95.WANG Zhengbin,DU Wen,WU Baiqing,et al.Model and algorithm for estimation of wagon flow of stage operating plan based on break-up and make-up sequences[J].Journal of Southwest Jiaotong University,2008,43(1):91-95.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views(1350) PDF downloads(282) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return