Citation: | JIA Hong, ZHOU Bo, LIU Guangbing. Advantage Analysis of Risk Model Based on Analytic Hierarchy Process[J]. Journal of Southwest Jiaotong University, 2009, 22(1): 72-76. |
熊亚洲.我国工程项目管理的现状、发展趋势及对策[J].工程建设与设计,2004,35(7):77-78.XIONG Yazhou.Status quo,development trend and countermeasures of construction project management in China[J].Constructian Project and Desiga,2004,35(7):77-78.[2] 谷东育.监理企业的人世应对措施[J].建筑,2002,24(1):12-13.GU Dongyu.Supervision company's measure of dealing with China's entering WTO[J].Architecture,2002,24(1):12-13.[3] 周宁风.论施工监理的四类质量风险[J].建设监理,2003,41(6):33-34.ZHOU Ningfeng.Four kinds of quality risks in construction supervision[J].Architecture Supervision,2003,41 (6):33-34.[4] 陈燕,何夕平.建设工程监理风险分析及对策[J].山西建筑,2004,30(22):131-132.CHENG Yan,HE Xiping.Risk analysis and countermeasures for construction project supervision[J].Shanxi Architecture,2004,30(22):131-132.[5] 廖江,周直,颜鑫.工程风险的模糊层次综合评价[J].重庆交通学院学报,2005,24(3):109-111.LIAO Jiang,ZHOU Zhi,YAN Xin.Fuzzy hierarchical comprehensive evaluation of construction risks[J].Journal of Chongqing Jiaotong University,2005,24 (3):109-111.[6] 周斌,白明.国际工程风险的模糊评价[J].石油工程建设,2003,29(1):44-46.ZHOU Bing,BAI Ming.Fuzzy judgment of international project risks[J].Petrol Construction Project,2003,29 (1):44-46.
|