Citation: | MAO Xueming, ZHAO Renda, WAN Zhen. Redistribution of Longitudinal Shear Force on Interface of Steel-Concrete Composite Beams[J]. Journal of Southwest Jiaotong University, 2006, 19(2): 174-178. |
聂建国,卫军.剪力连接件在钢-混凝土组合梁中的实际工作性能[J].郑州工学院学报,1991,12(4):44-47.NIE Jianguo,WEI Jun.Real behaviour of shear connectors in composite steel-concrete beams[J].Journal of Zhengzhou Institute of Technology,1991,12(4):44-47.[2] Velendanda M R,Hosain M U.Behaviour of perfobond rib shear connector:push-out tests[J].Canadian Journal of Civil Engineering,1992,19(1):1-10.[3] 聂建国,沈聚敏,袁彦声,等.钢-混凝土组合梁中剪力连接件实际承载力的研究[J].建筑结构学报,1996,17(2):21-29.NIE Jianguo,SHEN Jumin,YUAN Yansheng,et al.Experiment and analysis of actual shear capacity of shear connectors in composite steel-concrete beams[J].Journal of Building Structures,1996,17 (2):21-29.[4] 山寺德明,伊東昇,森河久.鶴見航路橋の設計概要(下)[J].橋梁と基礎,1993,2:23-32.[5] 时为民,江世永,赵文斌.组合板结合面水平剪力的计算[J].四川建筑科学研究,2000,26(3):12-13.SHI Weimin,JIANG Shiyong,ZHAO Wenbin.The calculation of horizontal shear between steel and concrete for composite slab[J].Building Science Research of Sichuan,2000,26 (3):12-13.[6] JASIM N A.Deflections of partially composite beams with linear connector density[J].Journal of Constructional Steel Research,1999(49):241-254.[7] 孙文彬.部分剪力连接钢-混凝土组合梁的滑移及曲率分析[J].力学与实践,2001,23(6):44-47.SUN Wenbin.Study on slip and curvature of the steel-concrete composite beams with partial shear connection[J].Mechanics and Practice,2001,23(6):44-47.[8] 赵鸿铁.钢与混凝土组合结构[M].北京:科学出版社,2001:30-32,75-76.[9] European Committee for Standardization.Eurocode 4 Design of composite steel and concrete structures-Part 2:Composite bridges[S].Brussels:[s.n.],1994.[10] 中华人民共和国建设部.GB 50017-2003钢结构设计规范[S].北京:中国计划出版社,2003.[11] 胡夏闽.欧洲规范4钢-混凝土组合梁设计方法(7)--剪力连接件设计[J].工业建筑,1996,26(3):46-51,57.HU Xiamin.Design method of Eurocode 4 for steel-concrete composite beams (7)-shear connection design in beams[J].Industrial Construction,1996,26(3):46-51,57.
|