[1] | ZHOU Wenliang, LI Peng, TIAN Junli, DENG Lianbo. Optimization of Train Timetable for Intercity Railway Based on Coordinated Operation of Multi-periodic Trains[J]. Journal of Southwest Jiaotong University, 2019, 54(4): 831-839. doi: 10.3969/j.issn.0258-2724.20170153 |
[2] | ZHANG Xiaobing, NI Shaoquan, PAN Jinshan. Optimization of Train Diagram Structure for High-Speed Railway[J]. Journal of Southwest Jiaotong University, 2016, 29(5): 938-943. doi: 10.3969/j.issn.0258-2724.2016.05.017 |
[3] | Shai Bin, ZHAOJ iahong. Multi-objective 0-1 Linear Programming Model for Combined Location-Routing Problem in Hazardous Waste Logistics System[J]. Journal of Southwest Jiaotong University, 2011, 24(2): 326-332. doi: 10.3969/j.issn.0258-2724.2011.02.025 |
[4] | NI Shao-quan, L Hong-xia, MA Si. Deduction Coefficient of Passenger Train on Speed-up Single-Track Lines[J]. Journal of Southwest Jiaotong University, 2003, 16(2): 192-195. |
[5] | NIShao-quan, L Hong-xia, YANGMing-lun. Research on Design of Train Diagram-Making System of Railways in China[J]. Journal of Southwest Jiaotong University, 2003, 16(3): 332-335. |
[6] | PENG Qi-yuan, YANHai-feng, YIN Yong. Carrying Capacity and Travelling Speed on Speed-up Single-Track Lines[J]. Journal of Southwest Jiaotong University, 2002, 15(5): 510-514. |
[7] | LI Ying-hong. A Permutation Algorithm for the Linear 0-1 Programming Model[J]. Journal of Southwest Jiaotong University, 2001, 14(5): 468-471. |
[8] | NIShao-quan, L Hong-xia, LIUJi-yong. Design and Implementation of an Adjusting System of Computerized Train Graph Systems[J]. Journal of Southwest Jiaotong University, 2001, 14(3): 240-244. |
[9] | PEI Zheng, HUANGTian-min. Fuzzy Approach for Bi-Level Programming Problems (Ⅱ)[J]. Journal of Southwest Jiaotong University, 2000, 13(1): 98-101. |
[10] | ZHANG Yu-cheng, LUhong-xia, WANG Bao-jie. The Analysis and Construction of Train Routine Based on Graphics Theory[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 273-276. |
[11] | YAN Yu-song. The Genetic Algorithms for the Carrying Capacity of Parallel Train Working Graph on Single Railway Lines[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 277-279. |
[12] | SHUAIBin, QINGXue-jiang. The Frame Design of Making Train Diagram System with Computer Based on OOP[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 259-263. |
[13] | PENG Qi-yuan, WANGJun, CUIXian-bo. Design on the Access to Distributed Database of the Network Train Diagram System[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 268-272. |
[14] | XIQing. Layout on Distributed Database System for Programming Train Diagram by Computer[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 264-267. |
[15] | Zhu Jianmei. Study on Optimization of Through Goods Train’s Linkage at Technical Station[J]. Journal of Southwest Jiaotong University, 1999, 12(3): 365-368. |