Citation: | XUE Feng, YUAN Ye, HU Zuoan, BHARAT Pathak. Representation and Estimation Method for Technical Station Capacity Based on Three-Parameter Interval Gray Numbers[J]. Journal of Southwest Jiaotong University, 2021, 56(5): 953-959. doi: 10.3969/j.issn.0258-2724.20190982 |
刘澜,王南,杜文. 车站咽喉通过能力网络优化模型及算法研究[J]. 铁道学报,2002,24(6): 1-5. doi: 10.3321/j.issn:1001-8360.2002.06.001
LIU Lan, WANG Nan, DU Wen. A study of network optimization model and algorithm for carrying capacity of station throat[J]. Journal of the China Railway Society, 2002, 24(6): 1-5. doi: 10.3321/j.issn:1001-8360.2002.06.001
|
刘庆伟,王慈光. 工业站到发线通过能力查定方法研究[J]. 铁道运输与经济,2004,26(6): 76-78. doi: 10.3969/j.issn.1003-1421.2004.06.034
LIU Qingwei, WANG Ciguang. Study on the determining of through capacity for the departure/arrival track of industrial station[J]. Railway Transport and Economy, 2004, 26(6): 76-78. doi: 10.3969/j.issn.1003-1421.2004.06.034
|
李海鹰,张超. 编组站到解系统通过能力计算方法[J]. 中国铁道科学,2010,31(3): 120-125.
LI Haiying, ZHANG Chao. Calculation method for the carrying capacity of the arriving and breaking up system in marshalling yard[J]. China Railway Science, 2010, 31(3): 120-125.
|
杨运贵. 铁路车站能力的计算方法与查定技术研究[D]. 成都: 西南交通大学, 2010.
|
方惠,王慈光,赵亮. 基于灰色系统理论的车站通过能力计算方法研究[J]. 铁道运输与经济,2012,34(4): 28-34. doi: 10.3969/j.issn.1003-1421.2012.04.007
FANG Hui, WANG Ciguang, ZHAO Liang. Research on calculation method of station passing capacity based on grey system theory[J]. Railway Transport and Economy, 2012, 34(4): 28-34. doi: 10.3969/j.issn.1003-1421.2012.04.007
|
李东. 重载铁路技术站通过能力研究[D]. 成都: 西南交通大学, 2015.
|
谢迎春,佟罡,冯俊杰. 考虑随机因素的编组站改编能力计算方法[J]. 铁道运输与经济,2016,38(10): 48-52.
XIE Yingchun, TONG Gang, FENG Junjie. The computation method about sorting capacity of marshalling station considering stochastic factors[J]. Railway Transport and Economy, 2016, 38(10): 48-52.
|
王月. 铁路技术站通过能力研究[D]. 成都: 西南交通大学, 2017.
|
ZHAO Qianrui, ZHANG Qi, LIU Pei. Calculation of carrying capacity at high-speed railway stations based on route selection[J]. Applied Mechanics and Materials, 2015(744/745/746): 1786-1791.
|
ARMSTRONG J, PRESTON J. Capacity utilisation and performance at railway stations[J]. Journal of Rail Transport Planning & Management, 2017, 7(3): 187-205.
|
BRANISHTOV S A, VERSHININ Y A, TUMCHENOK D A, et al. Graph methods for estimation of railway capacity[C]//17th International IEEE Conference on Intelligent Transportation Systems (ITSC). Qingdao: [s.n.], 2014: 525-530.
|
陈科宇. 考虑不确定性影响的公交到站时间区间预测方法研究[D]. 南京: 东南大学, 2017.
|
陈小月. 基于区间不确定量的结构可靠性泛灰数方法研究[D]. 长沙: 湖南大学, 2017.
|
丁先文,邹舒,林金官. Bootstrap方法与经典方法在区间估计中的比较[J]. 统计与决策,2012(23): 72-73.
DING Xianwen, ZOU Shu, LIN Jinguan. Comparison between bootstrap method and classical method in interval estimation[J]. Statistics & Decision, 2012(23): 72-73.
|
刘恒,梅卫,单甘霖. 小样本数据的三种区间估计方法性能分析[J]. 系统工程与电子技术,2014,36(10): 1929-1933. doi: 10.3969/j.issn.1001-506X.2014.10.07
LIU Heng, MEI Wei, SHAN Ganlin. Analysis on performance of three interval estimation methods for small samples[J]. Systems Engineering and Electronics, 2014, 36(10): 1929-1933. doi: 10.3969/j.issn.1001-506X.2014.10.07
|
LIU Y, WANG G Y, KE H F. Approach of parameter estimation for small samples based on grey distance measure[J]. Systems Engineering and Electronics, 2008, 30(1): 116-119.
|
LIU Y, WANG G Y, KE H F, et al. A non-statistical approach of parameter estimation for field data processing[J]. Signal Processing, 2009, 25(1): 113-117.
|
孙海龙,姚卫星. 区间数排序方法评述[J]. 系统工程学报,2010,25(3): 18-26.
SUN Hailong, YAO Weixing. Comments on methods for ranking interval numbers[J]. Journal of Systems Engineering, 2010, 25(3): 18-26.
|
袁野. 技术站作业系统能力三参数区间泛灰数表示及协调优化研究[D]. 成都: 西南交通大学, 2019.
|