ZHANG Qiangfeng, LÜ Hongxia, YANG Yuxiang. Evaluation of High-Speed Railway Maintenance Plan Factors Based on Triangular Fuzzy Number[J]. Journal of Southwest Jiaotong University, 2018, 53(4): 798-805. doi: 10.3969/j.issn.0258-2724.2018.04.018
Citation: ZHANG Qiangfeng, LÜ Hongxia, YANG Yuxiang. Evaluation of High-Speed Railway Maintenance Plan Factors Based on Triangular Fuzzy Number[J]. Journal of Southwest Jiaotong University, 2018, 53(4): 798-805. doi: 10.3969/j.issn.0258-2724.2018.04.018

Evaluation of High-Speed Railway Maintenance Plan Factors Based on Triangular Fuzzy Number

doi: 10.3969/j.issn.0258-2724.2018.04.018
  • Received Date: 14 Dec 2017
  • Publish Date: 01 Aug 2018
  • In order to improve the maintenance abilities of high speed railway and reduce train delays, an evaluation system is proposed based on actual maintenance plan data. Evaluation of the railway maintenance plan is supposed to identify any weak links and contribute to the safety of the operational environment. In this system, four key maintenance plan factors are identified:power supply, control system equipment, station infrastructure, and signal and communication equipment. The triangular fuzzy number and a fuzzy evaluation method are introduced to build an importance scale matrix for estimating the importance of these four factors in maintenance plans. Delays caused by equipment and infrastructure failures are extracted and combined based on real delayed train data. These factors are also proved to be independent. Factors causing delays and the number of delayed trains are used to quantitatively measure the effects of maintenance plan factors. Finally, maintenance plan data and delayed train data from the China Railway Company are used to verify the feasibility of the method. Results show that implementing a daily HSR maintenance plan has a positive effect on decreasing train delays. The amount of attention focused on the maintenance factors is inversely proportional to the delay situation. Maintenance of control equipment and power supply equipment is weak, which is the primary cause of train delays.

     

  • loading
  • 王辰宇.京沪高铁综合维修天窗设置方案优化研究[D].成都: 西南交通大学, 2016.
    文超.高速铁路列车运行冲突管理研究[D].成都: 西南交通大学, 2012.
    陶思宇, 黄树明, 屈明月.基于周期天窗的高速铁路夕发朝至列车通过能力研究[J].铁道运输与经济, 2014, 36(1):9-13. doi: 10.3969/j.issn.1003-1421.2014.01.003

    TAO Siyu, HUANG Shuming, QU Mingyue. Study on carrying capacity of evening-departure & morning-arrival high-speed trains based on periodical maintenance window[J]. Railway Transport and Economy, 2014, 36(1):9-13. doi: 10.3969/j.issn.1003-1421.2014.01.003
    HIGGINS A. Scheduling of railway track maintenance activities and crews[J]. Journal of the Operational Research Society, 1998, 49(10):1026-1033. doi: 10.1057/palgrave.jors.2600612
    VANSTEENWEGEN P, OUDHEUSDEN D V. Decreasing the passenger waiting time for an intercity rail network[J]. Transportation Research Part B Methodological, 2007, 41(4):478-492. doi: 10.1016/j.trb.2006.06.006
    林宏.高速铁路综合维修计划编制方法优化研究[J].铁道运输与经济, 2017, 39(7):13-17. http://d.old.wanfangdata.com.cn/Periodical/tdysyjj201707003

    LIN Hong. Study on optimizing the method of high-speed railway comprehensive maintenance planning[J]. Railway Transport and Economy, 2017, 39(7):13-17. http://d.old.wanfangdata.com.cn/Periodical/tdysyjj201707003
    邓永贵. V型接触网维修"天窗"对车站通过能力的影响[J].铁道运输与经济, 2003, 25(9):54-56. doi: 10.3969/j.issn.1003-1421.2003.09.024

    DENG Yonggui. The influence to through capacity of arrival/departure track caused by the maintenance gap of V type catenaries[J]. Railway Transport and Economy, 2003, 25(9):54-56. doi: 10.3969/j.issn.1003-1421.2003.09.024
    王进勇, 闫海峰, 许绍兴. V型天窗对线路通过能力的影响[J].西南交通大学学报, 2003, 38(2):196-200. doi: 10.3969/j.issn.0258-2724.2003.02.018

    WANG Jinyong, YAN Haifeng, XU Shaoxing. Influence of V form skylight on carrying capacity of railways[J]. Journal of Southwest Jiaotong University, 2003, 38(2):196-200. doi: 10.3969/j.issn.0258-2724.2003.02.018
    朱健梅, 闫海峰.武广客运专线天窗合理开设方式研究[J].北京交通大学学报, 2004, 28(2):107-110. doi: 10.3969/j.issn.1673-0291.2004.02.026

    ZHU Jianmei, YAN Haifeng. Research on reasonable mode of skylight on wuhan-guangzhou passenger special line[J]. Journal of Northern Jiaotong University, 2004, 28(2):107-110. doi: 10.3969/j.issn.1673-0291.2004.02.026
    林原宏.模糊语意量表的语意模糊数建构演算与实证分析[J].中央研究院调查研究期刊, 2002, 1(11):31-71.

    LIN Yuanhong. The construction of fuzzy linguistic numbers for questionnaire and its empirical study[J]. Journal of Investigation and Research of Academia Sinica, 2002, 1(11):31-71.
    DUBIOS D, PRADE H. Operations on fuzzy numbers[J]. International Journal of Systems Science, 1978(9):613-626. http://d.old.wanfangdata.com.cn/OAPaper/oai_doaj-articles_4a09278cf50188adb9658754e1e2f775
    DIJKMAN J G, VAN HAERINGEN H, DE LANGE S J. Fuzzy numbers[J]. Journal of Mathematical Analysis and Applications, 1983, 92(2):301-341. doi: 10.1016/0022-247X(83)90253-6
    ZHU K J, JING Y, CHANG D Y. A discussion on extent analysis method and applications of fuzzy AHP[J]. European journal of operational research, 1999, 116(2):450-456. doi: 10.1016/S0377-2217(98)00331-2
    CHANG D Y. Applications of the extent analysis method on fuzzy AHP[J]. European Journal of Operational Research, 1996, 95(3):649-655. doi: 10.1016/0377-2217(95)00300-2
    徐泽水.基于FOWA算子的三角模糊数互补判断矩阵排序法[J].系统工程理论与实践, 2003, 23(10):86-89. doi: 10.3321/j.issn:1000-6788.2003.10.014

    XU Zeshui. A priority method for triangular fuzzy number complementary judgement matrix[J]. Systems Engineering Theory & Practice, 2003, 23(10):86-89. doi: 10.3321/j.issn:1000-6788.2003.10.014
    张孝远, 陈凯华.基于三角模糊数的综合评价体系的研究[J].中国科技论文在线, 2006, 5:317-324. http://d.old.wanfangdata.com.cn/Thesis/Y3113921

    ZHANG Xiaoyuan, CHEN Kaihua. Research on comprehensive appraisal system on triangular fuzzy number[J]. Sciencepaper Online, 2006, 5:317-324. http://d.old.wanfangdata.com.cn/Thesis/Y3113921
    马莉, 周杰, 吴翠芳.基于三角模糊数的高校教师学术评价方法研究[J].统计与管理, 2016(5):180-182. http://d.old.wanfangdata.com.cn/Periodical/tjygl201605092

    MA Li, ZHOU Jie, Wu Cuifang. Research on academic evaluation for university teachers on triangular fuzzy number[J]. Statistics and Management, 2016(5):180-182. http://d.old.wanfangdata.com.cn/Periodical/tjygl201605092
    徐泽水.模糊互补判断矩阵排序的最小方差法[J].系统工程理论与实践, 2001, 21(10):93-96. doi: 10.3321/j.issn:1000-6788.2001.10.016

    XU Zeshui. The least variance priority method (LVM) for fuzzy complementary judgement matrix[J]. System Engineering Theory and Practice, 2001, 21(10):93-96. doi: 10.3321/j.issn:1000-6788.2001.10.016
    魏翠萍.层次分析法中和积法的最优化理论基础及性质[J].系统工程理论与实践, 1999, 19(9):113-115. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=QK199900735630

    WEI Cuiping. The optimization basis and properties of the sum-product method in AHP[J]. System Engineering Theory and Practice, 1999, 19(9):113-115. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=QK199900735630
    YANG Yuxiang, LI Jie, WEN Chao, et al. Statistical distribution analysis of high-speed railway delay causes: evidence from guangzhou railway corporation in China[C]//RailLille 2017: the 7th International Conference on Railway Operations Modelling and Analysis. Lille: [s.n.], 2017: 1511-1531.
    LEE E S, LI R J. Comparison of fuzzy numbers based on the probability measure of fuzzy events[J]. Computers & Mathematics with Applications, 1988, 15(10):887-896. doi: 10.1016-0898-1221(88)90124-1/
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(3)  / Tables(9)

    Article views(406) PDF downloads(63) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return