Citation: | NING Xinwen, ZHU Qing, REN Xiaochun, HAN Zujie, WANG Hua, ZHAO Wen, ZHANG Heng. Graphical Processing Method of High-Speed Railway Construction Progress Data[J]. Journal of Southwest Jiaotong University, 2018, 53(2): 414-419. doi: 10.3969/j.issn.0258-2724.2018.02.027 |
MCCULLOCH B. Automating field data collection in construction organizations[C]//Construction Congress Ⅴ: Managing Engineered Construction in Expanding Global Markets. Minneapolis: The American Society of Civil Engineers (ASCE), 1997: 957-963. https://www.researchgate.net/publication/313569657_Automating_field_data_collection_in_construction_organizations
|
JASELSKIS E, EL-MISALAMI T. Radio frequency identification application for constructors[C]//The International Symposium on Automation and Robotics in Construction and Mining. Taipei: The International Association for Automation and Robotics in Construction (IAARC), 2000: 1-4. https://www.researchgate.net/publication/320606077_Radio_Frequency_Identification_Application_for_Constructors
|
王富庆.铁路建设项目进度管理信息系统研究[D].北京: 北京交通大学, 2007. http://cdmd.cnki.com.cn/Article/CDMD-10004-2008049315.htm
|
闫素旺.沙巴州更新改造铁路工程施工方法及进度管理研究[D].成都: 西南交通大学, 2012. http://cdmd.cnki.com.cn/Article/CDMD-10613-1012390172.htm
|
张树艳, 尹逊霄, 孙美, 等.铁路建设项目进度管理方法研究[J].铁路计算机应用, 2014, 23(10):42-46. doi: 10.3969/j.issn.1005-8451.2014.10.011
ZHANG Shuyan, YIN Xunxiao, SUN Mei, et al. Method of schedule management for railway projects[J]. Railway Computer Application, 2014, 23(10):42-46. doi: 10.3969/j.issn.1005-8451.2014.10.011
|
徐欣.铁路工程项目进度管理系统关键技术研究[D].石家庄: 石家庄铁道大学, 2013. http://cdmd.cnki.com.cn/Article/CDMD-10107-1013310797.htm
|
LEUNG S W, MAK S, LEE B L P. Using a real-time integrated communication system to monitor the progress and quality of construction works[J]. Automation in Construction, 2008, 17(6):749-757. doi: 10.1016/j.autcon.2008.02.003
|
CHIN S, YOON S, CHOI C, et al. RFID+4 D CAD for progress management of structural steel works in high-rise buildings[J]. Journal of Computing in Civil Engineering, 2008, 22(2):74-89. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=82ffeadf767ead517dfb2ae9a59b9d90
|
El-OMARI S, MOSELHI O. Integrating 3D laser scanning and photogrammetry for progress measurement of construction work[J]. Automation in Construction, 2009, 18(1):1-9. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=58279db3dcb8ffda31e29fb4aa007556
|
BOSCHE F, HAAS C T, AKINCI B. Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control[J]. Journal of Computing in Civil Engineering, 2009, 23(6):311-318. doi: 10.1061/(ASCE)0887-3801(2009)23:6(311)
|
GOLPARVAR-FARD M, BOHN J, TEIZER J, et al. Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques[J]. Automation in Construction, 2011, 20(8):1143-1155. doi: 10.1016/j.autcon.2011.04.016
|
SARDROUD J M. Influence of RFID technology on automated management of construction materials and components[J]. Scientia Iranica, 2012, 19(3):381-392. https://www.sciencedirect.com/science/article/pii/S1026309812000727
|
张康照.基于BIM实时模型的施工进度监测系统研究[D].天津: 天津大学, 2012. http://www.wanfangdata.com.cn/details/detail.do?_type=degree&id=D323655
|
ZHU Z, BRILAKIS I. Comparison of optical sensor-based spatial data collection techniques for civil infrastructure modeling[J]. Journal of Computing in Civil Engineering, 2009, 23(3):170-177. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=bc456ee53f20e385014135120fe4b5cf
|
El-OMARI S, MOSELHI O. Integrating automated data acquisition technologies for progress reporting of construction projects[J]. Automation in Construction, 2011, 20(6):699-705. doi: 10.1016/j.autcon.2010.12.001
|