[1] | XU Chang’an, NI Shaoquan, CHEN Dingjun. Collaborative Optimization for Timetable and Maintenance Window Based on Two-Stage Algorithm[J]. Journal of Southwest Jiaotong University, 2020, 55(4): 882-888. doi: 10.3969/j.issn.0258-2724.20180577 |
[2] | ZHOU Wenliang, LI Peng, TIAN Junli, DENG Lianbo. Optimization of Train Timetable for Intercity Railway Based on Coordinated Operation of Multi-periodic Trains[J]. Journal of Southwest Jiaotong University, 2019, 54(4): 831-839. doi: 10.3969/j.issn.0258-2724.20170153 |
[3] | ZHANG Xiaobing, NI Shaoquan, PAN Jinshan. Optimization of Train Diagram Structure for High-Speed Railway[J]. Journal of Southwest Jiaotong University, 2016, 29(5): 938-943. doi: 10.3969/j.issn.0258-2724.2016.05.017 |
[4] | PENG Qiyuan, BAO Jingjing, WEN Chao, FENG Liping. Evaluation Theory and Method of High-Speed Train Diagrams[J]. Journal of Southwest Jiaotong University, 2013, 26(6): 969-974. doi: 10.3969/j.issn.0258-2724.2013.06.001 |
[5] | ZHAO Dan, ZHANG Jiatai, SHU Haisheng, ZHAO Gang. Double Layer Genetic Algorithm for Integrated Scheduling Optimization of Part and Tool Flows[J]. Journal of Southwest Jiaotong University, 2010, 23(6): 926-931. doi: 10.3969/j.issn.0258-2724.2010.06.018 |
[6] | TAO Ran, LÜ, Hongxia, CHEN Guangxiu. Model and Algorithm for Making Locomotive Working Diagram Based on Multiple Traveling Salesmen Problem[J]. Journal of Southwest Jiaotong University, 2006, 19(5): 653-657. |
[7] | SHIHong-guo, PENG Qi-yuan. Development of Train out Report Subsystem of Railway Sub-administration Dispatch System[J]. Journal of Southwest Jiaotong University, 2004, 17(2): 199-202. |
[8] | CAI Zong-yan, WANG Ning-sheng, REN Shou-gang, LI Ya-bai. Scheduling of Reconfigurable Manufacturing System Based on Timed Reconfigurable Petri Net[J]. Journal of Southwest Jiaotong University, 2004, 17(3): 341-344. |
[9] | NIShao-quan, L Hong-xia, YANGMing-lun. Research on Design of Train Diagram-Making System of Railways in China[J]. Journal of Southwest Jiaotong University, 2003, 16(3): 332-335. |
[10] | NIShao-quan, L Hong-xia, LIUJi-yong. Design and Implementation of an Adjusting System of Computerized Train Graph Systems[J]. Journal of Southwest Jiaotong University, 2001, 14(3): 240-244. |
[11] | LvHong-xia, NIShao-quan, JIHong-ye. The Study on DSS of the Technical Station Dispatching ———Rationally Utilizing Reception and Departure Siding[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 255-258. |
[12] | SHUAIBin, QINGXue-jiang. The Frame Design of Making Train Diagram System with Computer Based on OOP[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 259-263. |
[13] | XIQing. Layout on Distributed Database System for Programming Train Diagram by Computer[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 264-267. |
[14] | PENG Qi-yuan, WANGJun, CUIXian-bo. Design on the Access to Distributed Database of the Network Train Diagram System[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 268-272. |
[15] | YAN Yu-song. The Genetic Algorithms for the Carrying Capacity of Parallel Train Working Graph on Single Railway Lines[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 277-279. |
[16] | Huang Qian, Huang Hongzhong, Cai Jianguo. An Encoding Solution and Algorithms for Job-Shop Scheduling Problem with Bottleneck[J]. Journal of Southwest Jiaotong University, 1999, 12(2): 185-189. |