Cen Minyi, Qu Guowan, Liao Shuzhong. GPS Construction Survey of the Piles,Towers and Anchorages of Humen Bridge[J]. Journal of Southwest Jiaotong University, 1999, 12(5): 560-564.
Citation: Cen Minyi, Qu Guowan, Liao Shuzhong. GPS Construction Survey of the Piles, Towers and Anchorages of Humen Bridge[J]. Journal of Southwest Jiaotong University, 1999, 12(5): 560-564.

GPS Construction Survey of the Piles, Towers and Anchorages of Humen Bridge

  • Publish Date: 25 Oct 1999
  • Humen bridge has a total length of 15.6 km and a main bridge length 4.58 km. In this paper, the construction surveyofHumen bridge conducted byGPS positioningtechnique is introduced. Practice proves that the layout precisions of the cable support towers and anchorages of the suspension bridge, the main piers of the continuous rigid frame bridge, and the piers of the west approach bridge are fulfilled to the bridge construction specifications. It also shows that GPS datum transformation by using”construction ellipsoid”in coastal plains can obtain satisfactory applicable results for bridge construction survey.

     

  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views(1196) PDF downloads(157) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return