Based on the investigation of the engineering geological environment and the
long-term monitoring of tunnel cracks, the surrounding rock of tunnel 105 is proved to
be a slack rock mass. A long-term gradual creep of the slack rock is the essence of the
crack deformation of the tunnel, which are resulted from stress relaxation, earth surface
scouring, rock collapses, landslides, underground water process and tunnel
construction, etc.