• ISSN 0258-2724
  • CN 51-1277/U
  • EI Compendex
  • Scopus
  • Indexed by Core Journals of China, Chinese S&T Journal Citation Reports
  • Chinese S&T Journal Citation Reports
  • Chinese Science Citation Database
Volume 21 Issue 2
Apr.  2008
Turn off MathJax
Article Contents
XUE Feng, WANG Ciguang, LUO Jian. Optimization for Static Wagon-Flow Allocation in Bidirectional Marshalling Station[J]. Journal of Southwest Jiaotong University, 2008, 21(2): 159-164.
Citation: XUE Feng, WANG Ciguang, LUO Jian. Optimization for Static Wagon-Flow Allocation in Bidirectional Marshalling Station[J]. Journal of Southwest Jiaotong University, 2008, 21(2): 159-164.

Optimization for Static Wagon-Flow Allocation in Bidirectional Marshalling Station

  • Received Date: 27 Nov 2006
  • Publish Date: 25 Apr 2008
  • Definitions such as wagon-flow allocation time spans and feasible wagon-flows, etc,were presented.A bi-level multi-objective decision model was established,in which the objective functions include the total cost for removing wagons to unwanted directions and those without enough time to be transferred to a proper yard,and number of wagons to be transferred.The model was solved using a tabu search strategy and a wagon-flow allocation network.An example verifies that a feasible wagon-flow allocation scheme can be determined through directing arrival trains to a proper yard to realize wagon-flow allocation optimization of two break-up and make-up systems in a bidirectional marshalling station,and to make all departure trains,except pick-up and drop trains,fully-loaded and on time.

     

  • loading
  • 何世伟,宋瑞,赵强.铁路编组站阶段计划DSS[J].系统工程,1996,14(4):62-66.HE Shiwei,SONG Rui,ZHAO Qiang.A study on DSS of stage plan for railway marshalling station[J].System Engineering,1996,14(4):62-66.[2] 王慈光.用表上作业法求解编组站配流问题的研究[J].铁道学报,2002,24(4):1-5.WANG Ciguang.Study on wagon-flow allocating problem in a marshalling station by using calculating method on-table[J].Journal of the China Railway Society,2002,24(4):1-5.[3] 吕红霞,倪少权,纪洪业.技术站调度决策支持系统的研究——到发线的合理使用[J].西南交通大学学报,2000,35(3):255-258.LU Hongxia,NI Shaoquan,JI Hongye.The study on DSS of the technical station dispatching-rationally utilizing reception and departure siding[J].Journal of Southwest Jiaotong University,2000,35 (3):255-258.[4] YAGAR S,SHI S Q.An efficient sequencing model for humping in a rail yard[J].Transportation Research Part A,1983,17(4):251-262.[5] DAVID R M,TENG H.Optimization of railway operations using neural networka[J].Transportation Research Part C.1995,4(1):33-49.[6] YUAN Jianxin,HANSEN A I.Optimizing capacity utilization of stations by estimating knock-on train delays[J].Transportation Research Part B,2006,41 (1):202-217.[7] 张全寿,张仲义,刘峰,等.编组站货车实时信息系统[M].北京:中国铁道出版社,1997:160-176.[8] 刘宝碇,赵瑞清,王纲.不确定规划及应用[M].北京:清华大学出版社,2003:8-9.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views(1416) PDF downloads(469) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return