Citation: | ZHOU Wen, LIU Xueyi. FEM Simulation of Straightening Tongue Rail of High-Speed Turnout[J]. Journal of Southwest Jiaotong University, 2008, 21(1): 82-85,95. |
何华武.时速250 km级18号道岔设计理论与试验研究[J].铁道学报,2007,29(1):66-71.HE Huawu.Research on the design theories and experiments of the 18# turnout under 250 km/h[J].Journal of the China Railway Society,2007,29(1):66-71.[2] 袁宝军,费维周.时速250 km客运专线铁路60 kg/m钢轨18号单开道岔制造工艺[J].铁道标准设计,2006(增刊):179-181.[3] 汪广志,王守锋.计算机控制尖轨淬火新工艺探讨[J].国外金属热处理,2002,23(1):18-19.[4] 张祖光.矫直对钢轨力学性能的影响[J].钢铁钒钛,1982,3(2):65-70.[5] 张龙华,毕思复,宋文宇.钢轨矫直技术的发展及其在鞍钢重轨生产中的应用[J].鞍钢技术,2004,33(2):36-39.ZHANG Longhua,BE Sifu,SONG Wenyu.Development of straightening steel rail technique and its application in angang heavy rail production[J].Angang Technology,2004,33 (2):36-39.[6] 郭华,邓勇.钢轨矫直压力的有限元计算[J].重型机械,2006,54(5):53-55.GUO Hua,DENG Yong.FEM computation of rail straightening force[J].Heavy Machinery,2006,54(5):53-55.[7] 崔甫.矫直原理与矫直机械[M].北京:冶金工业出版社,2005:113-138.[8] 周存龙,王国栋,刘相华,等.压弯量对轧件矫直变形影响的有限元分析[J].塑性工程学报,2005,13(1):78-81.ZHOU Cunlong,WANG Guodong,LIU Xianghua,et al.The FEM analysis for the effect of intermesh to plate leveling deformation[J].Journal of Plasticity Engineering,2005,13 (1):78-81.[9] 张银花,陈朝阳,周清跃.钢轨屈服强度指标取值研究[J].铁道建筑,2006,46(3):92-94.
|