[1] | LIU Gehui, JIN Hua, PENG Qiyuan, LIU Ling, RAN Xinchen, LAN Zhen. Crew Rostering Schedule Optimization for Urban Rail Transit Through Resource Sharing[J]. Journal of Southwest Jiaotong University. doi: 10.3969/j.issn.0258-2724.20230165 |
[2] | WANG Na, LI Yinzhen, CHAI Huo. Decision-Making Approach of Two-Sided Many-to-Many Matching of Supply and Demand for Logistics Service Based on Matching Balance[J]. Journal of Southwest Jiaotong University, 2022, 57(2): 425-433. doi: 10.3969/j.issn.0258-2724.20200567 |
[3] | XU Chang’an, NI Shaoquan, CHEN Dingjun. Collaborative Optimization for Timetable and Maintenance Window Based on Two-Stage Algorithm[J]. Journal of Southwest Jiaotong University, 2020, 55(4): 882-888. doi: 10.3969/j.issn.0258-2724.20180577 |
[4] | ZHOU Wenliang, LI Peng, TIAN Junli, DENG Lianbo. Optimization of Train Timetable for Intercity Railway Based on Coordinated Operation of Multi-periodic Trains[J]. Journal of Southwest Jiaotong University, 2019, 54(4): 831-839. doi: 10.3969/j.issn.0258-2724.20170153 |
[5] | ZHANG Xiaobing, NI Shaoquan, PAN Jinshan. Optimization of Train Diagram Structure for High-Speed Railway[J]. Journal of Southwest Jiaotong University, 2016, 29(5): 938-943. doi: 10.3969/j.issn.0258-2724.2016.05.017 |
[6] | TAO Ran, LÜ, Hongxia, CHEN Guangxiu. Model and Algorithm for Making Locomotive Working Diagram Based on Multiple Traveling Salesmen Problem[J]. Journal of Southwest Jiaotong University, 2006, 19(5): 653-657. |
[7] | NIShao-quan, L Hong-xia, YANGMing-lun. Research on Design of Train Diagram-Making System of Railways in China[J]. Journal of Southwest Jiaotong University, 2003, 16(3): 332-335. |
[8] | FENGXiao-yun, ZHAO Dong-mei, LI Zhi. A New Algorithm for Fuzzy Multi-objective Prediction Control Based on Satisfactory Optimization[J]. Journal of Southwest Jiaotong University, 2002, 15(1): 99-102. |
[9] | GUANQin-chuan. Fuzzy Multi-objective Optimization Based on Neural Networks[J]. Journal of Southwest Jiaotong University, 2002, 15(3): 338-342. |
[10] | NIShao-quan, L Hong-xia, LIUJi-yong. Design and Implementation of an Adjusting System of Computerized Train Graph Systems[J]. Journal of Southwest Jiaotong University, 2001, 14(3): 240-244. |
[11] | ZHANG Yu-cheng, LUhong-xia, WANG Bao-jie. The Analysis and Construction of Train Routine Based on Graphics Theory[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 273-276. |
[12] | YAN Yu-song. The Genetic Algorithms for the Carrying Capacity of Parallel Train Working Graph on Single Railway Lines[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 277-279. |
[13] | SHUAIBin, QINGXue-jiang. The Frame Design of Making Train Diagram System with Computer Based on OOP[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 259-263. |
[14] | XIQing. Layout on Distributed Database System for Programming Train Diagram by Computer[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 264-267. |
[15] | PENG Qi-yuan, WANGJun, CUIXian-bo. Design on the Access to Distributed Database of the Network Train Diagram System[J]. Journal of Southwest Jiaotong University, 2000, 13(3): 268-272. |
[16] | Zhu Jianmei. Study on Optimization of Through Goods Train’s Linkage at Technical Station[J]. Journal of Southwest Jiaotong University, 1999, 12(3): 365-368. |