Citation: | LI Ruiping, ZHOU Ning, MEI Guiming, ZHANG Weihua. Finite Element Model for Catenary in Initial Equilibrium State[J]. Journal of Southwest Jiaotong University, 2009, 22(5): 732-737. |
LOPEZ G O,CARNICERO A,MARONO J L.Influence of stiffness and contact modeling on catenary-pantograph system dynamics[J].Joural of Sound and Vibration,2007,299(4-5):806-821.[2] ALBERTO A,BENET J,ARIAS E,et al.A high performance tool for the simulation of the dynamic pantograph-catenary interaction[J].Mathematics and Computers in Simulation,2008,79(3):652-667.[3] PARK T J,HANB C S,JANGC J H.Dynamic sensitivity analysis for the pantograph of a high-speed rail vehicle[J].Journal of Sound and Vibration,2003,266(2):235-260.[4] WU T X,BRENNAN M J.Basic analytical study of pantograph catenary system dynamics[J].Vehicle System Dynamics,1998,30(6):443-456.[5] WU T X,BRENNAN M J.Dynamic stiffness of a railway overhead wire system and its effect on pantograph-catenary system dynamics[J].Journal of Sound and Vibration,1999,219(3):483-502.[6] 张卫华,沈志云.接触网动态研究[J].铁道学报,1991,13(4):26-33.ZHANG Weihua,SHEN Zhiyun.Dynamic studies on catenary[J].Journal of the China Railway Society,1991,13(4):26-33.[7] COLLINA A B.Numerical simulation of pantograph-overhead equipment interaction[J].Vehicle System Dynamics,2002,38(4):261-291.[8] 张卫华.准高速接触网动态性能的研究[J].西南交通大学学报,1997,32(2):187-192.ZHANG Weihua.On dynamic behavior of the quasi-high-speed catenary[J].Journal of Southwest Jiaotong University,1997,32(2):187-192.[9] 吴天行.接触网的有限元计算与分析[J].铁道学报,1996,18(3):44-48.WU Tianxing.Analysis and calculation of catenary by FEM[J].Journal of the China Railway Society,1996,18(3):44-48.[10] LOPEZ G O,CARNICEROA A,TORRESB V.Computation of the initial equilibrium of railway overheads based on the catenary equation[J].Engineering Structures,2006,28(10):1387-1394.[11] 凌道盛,徐兴.非线性有限元及程序[M].浙江:浙江大学出版社,2004.
|