Citation: | ZHANG Honghai, HU Minghua. Multi-objection Optimization for Collaborative Scheduling Aircraft Landing on Multi-runways[J]. Journal of Southwest Jiaotong University, 2009, 22(3): 402-409. |
BEASLEY J E,KRISHNAMOORTHY M,SHARAIHA Y M,et al.Scheduling aircraft landings-the static case[J].Transport Science,2000,34(2):180-197.[2] BEASLEY J E,SONANDER J,HAVELOCK P.Scheduling aircraft landings at London Heathrow using a population heuristic[J].Journal of the Operational Research Society,2001,52(5):483-493.[3] FAHLE T,FELDMANN R,GOTZ S,et al.The aircraft sequencing problem[C]//Computer Science in Perspective.New York:Springer-Verlag,Berlin:Heidelberg,2003:152-166.[4] SOOMER M J,FRANX G J.Scheduling aircraft landings using airlines'preferences[J].European Journal of Operational Research,2008,190(1):277-291.[5] 余江,刘晓明,蒲云.飞机着陆调度问题的MPS优化算法研究[J].系统工程理论与实践,2004,24(3):119-122.YU Jiang.LIU Xiaoming,PU Yun.Research on MPS optimization to landing schedule problem[J].System Engineering--Theory Practice,2004,24(3):119-122.[6] 杨秋辉,游志胜,冯子亮,等.一种改进的基于遗传算法的多跑道到达飞机调度[J].四川大学学报:工程科学版,2006,38(2):141-145.YANG Qiuhui,YOU Zhisheng,FENG Ziliang,et al.Scheduling arrival aircrafts on multiple runways based on an improved genetic algorithm[J].Journal of Sichuan Univrsity:Engineering Science Edition,2006,38(2):141-145.[7] 游进军,纪昌明,付湘.基于遗传算法的多目标问题求解方法[J].水利学报,2003,34(7):64-69.YOU Jinjun,JI Changming,FU Xiang.New method for solving multi-objective problm based on genetic algorithm[J].Joumal of Hydraulic Engineering,2003,34(7):64-69.[8] 薛劲松,宋宏.CIMS的总体设计[M].北京:机械工业出版社,1997:209-214.[9] 徐肖豪,李雄.航班地面等待模型中的延误成本分析与仿真[J].南京航空航天大学学报,2006,38(1):115-120.XU Xiaohao,LI Xiong.Cost analysis of flight delays and simulation in ground-holding model[J].Journal of Nanjing University of Aeronautics Astronautic,2006,38(1):115-120.
|