Citation: | GAO Jianmin, ZHAI Wanming. Application of Vehicle-Track Coupling Dynamics to Study on Settlement of Railway Tracks[J]. Journal of Southwest Jiaotong University, 2007, 20(4): 431-435. |
曾树谷.铁路散粒体道床[M].北京:中国铁道出版社,1997:245-307.[2] ANDERSON R J.The dynamics of vehicles on roads and on tracks[C]//Anderson R J.The Dynamics of Vehicles on Roads and Tracks.Amsterdam:Swets Zeitlinger,1989:502-515.[3] 何永春,王午生.铁路轨道高低不平顺的预测及其应用[J].上海铁道大学学报,1999,2(2):64-70.HE Yongchun,WANG Wusheng.Forecast and its application of railway track height irregularity[J].Journal of Shanghai Railway University,1999,2(2):64-70.[4] 董大埙.铁路轨道[M].北京:中国铁道出版社,1988:130-137.[5] 内田雅夫,石川达也,三和雅史.轨道狂ぃ进みじ着目した有道床轨道の新しぃ设计法[J].铁道総研報告,1995,9(4):37-42.UCHIDA M,ISHIKAWA T,MIWA M.The newly design method of ballasted track structure considering track irregularity growth[J].Report of Railway Technical Research Institute (RTRI),1995,9(4):37-42.[6] 胡仁伟,赵钢.道床累积变形模型的改进及荷载作用顺序对累积变形的影响[J].铁道学报,2001,12(6):81-84.HU Renwei,ZHAO Gang.Improvement of model of ballast accumulative deformation and the effect of load order on accumulative deformation[J].Journal of the China Railway Society,2001,12(6):81-84.[7] SHENTON M J.Ballast deformation and track deterioration[C]// Karagiannis D.Track Technology.London:Lonson Thomas Telford,1985:11-13.[8] LUNDQVIST A,DAHLBERG T.Dynamic train/track interaction including model for track settlement evolvement[J].Vehicle System Dynamics,2004,41 (Supplement):667-676.[9] 石田誠,名村明.軌道沈下の実験と.シミユレ一ションにょる予測[J].鉄道総研報告,2002,16(4):41-47.ISHIDA M,NAMURA A.Meastrements of track settlement and its prediction with track dynamic model[J].Report of Railway Technical Research Institute (RTRI),2002,16(4):41-47.[10] 翟婉明.车辆-轨道耦合动力学[M].第二版,北京:中国铁道出版社,2002:20-33,365-373.[11] ZHAI W M,WANG K Y,LIN J H.Modelling and experiment of railway ballast vibrations[J].Journal of Sound and Vibration,2004,207(4-5):673-683.[12] 王继军,吴旺青.既有线轨道刚度及部件刚度统计特征的研究[R].北京:中国铁道科学研究院,2001:5-8.
|