Citation: | LI Xiaobin, YANG Yongqing, PU Qianhui, LIU Zusheng. Model Test of Cantilever Casting Construction of Reinforced Concrete Arch Bridge[J]. Journal of Southwest Jiaotong University, 2007, 20(5): 526-530. |
雷俊卿.桥梁悬臂施工与设计[M].北京:人民交通出版社,1999:216-219.[2] MARSEL F.The construction of large-span concrete arch bridges with cantilevering method using temporary cable-stays[C]//Proceedings of the International Conference on Bridge.Croatia:Croatian Society of Structural Engineering,2006:775-783.[3] 戴震番.克尔克桥的大跨度混凝土拱桥悬臂法施工[J].世界桥梁,1982(4):59-61.[4] 范瑛,梅利芳.日本富士川混凝土拱桥的设计与施工[J].世界桥梁,2002(2):14-17.[5] 孙玲.钢筋混凝土拱桥悬臂现浇施工控制分析[J].铁道建筑,2004(11):26-27.SUN Ling.Study on the control of reinforced concrete arch bridge constructed cantilever cast[J].Railway Engineering,2004 (11):26-27.[6] 刘万忠.悬臂拼装钢筋混凝土拱桥的施工控制[D].长沙:湖南大学土木工程学院,2001:21-35.[7] AU F T K,WANG Jiejun,LIU Gangdong.Construction control of reinforced concrete arch bridges[J].Journal of Bridge Engineering,2003,8(1):39-45.
|