Citation: | ZHANG Xueyuan, WU Guangning, DENG Mingli, GAO Bo. Scheme for Naturally Passing Neutral Sections of High Speed Railways[J]. Journal of Southwest Jiaotong University, 2007, 20(6): 680-684,690. |
孙万启,单圣熊,郑国藩.国内外自动过分相装置的比较[J].电气化铁路,2002(2):12-16.[2] 侯文葳,刘宝锟.广深铁路200(km·h-1)电气化新技术[J].中国铁道科学,2001,22(4):139-140.HOU Wenwei.LIU Baokun.New technologies for the 200(km·h-1)Guangzhou-Shenzhen electrified railway[J].China Railway Science,2001,22(4):139-140.[3] 严云升.电力机车自动过分相方案的探讨[J].机车电传动,1999(4):1-3.[4] 严云升.电力机车和电动车组自动过分相方案的发展方向[J].机车电传动,2004(10):7-10.YAN Yunsheng.Development trend of the scheme of auto-passing phase separations for electric locomotive and EMUs[J].Electric Drive for Locomotives,2004(10):7-10.[5] 董志杰.地面自动过分相技术及方案研究[D].成都:西南交通大学,2004.[6] 钮承新,耿杰.电气化铁路网上断载电力机车自动过分相装置研究与试验[J].继电器,2001,29(12):55-57.NIU Chengxin,GENG Jie.Research and test on the device of switched-off locomotive passing through the phase-separation insulator automatically in railroad[J].Relay,2001,29(12):55-57.[7] 郭保青,余祖俊,许西宁,等.仿人控制的电力机车自动过分相装置研究[J].铁道学报,2002,24(6):20-23.GUO Baoqing,YU Zujun,XU Xining,et al.Design of automatic splitting phase device for electrical locomotives based on apery control[J].Journal of the China Railway Society,2002,24(6):20-3.[8] 郭保青,余祖俊,唐涛.冗余结构的电力机车自动过分相方案设计[J].北京交通大学学报,2006,30(5):88-91.GUO Baoqing,YU Zujun,TANG Tao.Redundant design of auto-passing phase separations for electric locomotive[J].Journal of Beijing Jiaotong University,2006,30(5):88-91.[9] 戴利民,林吉忠,丁新华.滑板材料受流摩擦时接触点瞬态温升对磨损性能的影响[J].中国铁道科学,2002,23(2):111-117.DAI Limin,LIN Jizhong,DING Xinhua.Effects of transient temperature risein contact areaon wear properties[J].China Railway Science,2002,23(2):111-117.[10] 戴利民,林吉忠,刘越,等.受电弓滑板受流摩擦中体温升的模拟计算分析[J].铁道学报,2002,24(5):56-61.DM Limin,LIN Jizhon1,LIU Yue,et al.Calculation and study on strip cubage temperature of pantograph pan in sliding electric contact abrasion[J].Journal of the China Railway Society,2002,24(5):56-61.
|