Citation: | ZHANG Jie, CHEN Tao, SHI Fugen. Computer Scheduling of Motor Train-sets for High Speed Passenger Railways[J]. Journal of Southwest Jiaotong University, 2006, 19(5): 635-640. |
HIROSE T,GOTO S,HAYAKAWA Y,et al.GUI-based interactive railway planning systems[C] //Computers in RailwaysⅣ,Railway Design and management.Southampton:Computational Mechanics Publications,1994:83-91.[2] 赵鹏,富井规雄.动车组运用计划及其编制算法[J].铁道学报,2003,25(3):1-7.ZHAO Peng,TOMII Norio.Train-set scheduling and an algorithm[J].Journal of the China Railway Society,2003,25 (3):1-7.[3] 赵鹏,富井规雄.基于路段交换的多基地动车组运用计划的编制算法[J].铁道学报,2004,26(1):7-11.ZHAO Peng,TOMII Norio.An algorithm for multiple-bases train-set scheduling Based on path-exchange[J].Journal of the China Railway Society,2004,26 (1):7-11.[4] 吴庄胜,赵清,王伯铭.高速列车运用检修及动车段的设计研究[J].西南交通大学学报,1997,32(3):277-282.WU Zhuangsheng,ZHAO Qing,WANG Boming.Operation and maintenance of high speed trains[J].Journal of Southwest Jiaotong University,1997,32(3):277-282.[5] 孙焰,李致中,李丰良.列车运行图最优初始布点方法.长沙铁道学院学报[J].1997,15(4):80-87.SUN Yan,LI Zhizhong,LI Fengliang.The optimal original trains distribution for travelling graph of trains[J].Journal of Changsha Railway University,1997,15 (4):80-87.
|