Citation: | ZHAO Lili, TAN Deqing, HUANG Qing. Pareto Improvement to Return Model in BOT Project[J]. Journal of Southwest Jiaotong University, 2006, 19(6): 769-773. |
YEO K T,TIONG L K R.Positive management of differences for risk reduction in BOT projects[J]. International Journal of Project Management,2000,18(4):257-265.[2] DAVID A K,FERNANDO P N.The BOT option,conflicts and compromises[J]. Energy Policy,1995,23(8):669-675.[3] KUMARASWAMY M M,ZHANG X Q.Governmental role in BOT-led infrastructure development[J]. International Journal of Project Management,2001,19(4):195-205.[4] LIN Mincheng.Contract design of private infrastructure concessions[D]. Berkeley:University of California,2000.[5] 赵立力,谭德庆,黄庆.BOT项目的可控制风险研究[J]. 中国管理科学,2005,13(5):39-43.ZHAO Lili,TAN Deqing,HUANG Qing.Research on controllable risk in BOT projects[J]. Chinese Journal of Management Science,2005,13(5):39-43.[6] 杨宏伟,何建敏,周晶.在BOT模式下收费道路定价和投资的博弈决策模型[J]. 中国管理科学,2003,11(2):30-33.YANG Hongwei,HE Jianmin,ZHOU Jing.Game decision making model on toll road pricing and investment under a BOT scheme[J]. Chinese Journal of Management Science,2003,11 (2):30-33.[7] 杨宏伟,周晶,何建敏.基于博弈论的交通BOT项目特许权期的决策模型[J]. 管理工程学报,2003,17(3):93-95.YANG Hongwei,ZHOU Jing,HE Jianmin.Decision making model on concession term for traffic BOT project on the basis of game theory[J]. Journal of Engneering Management,2003,17(3):93-95.[8] HO S P.Real options and game theoretic valuation,financing and tendering for investments on build-operate-transfer projects[D]. Urbana-Champaign:University of Illinois at Urbana-Champaign,2001.[9] YANG H,MENG Q.Highway pricing and capacity choice in a road network under a build-operate-transfer scheme[J]. Transportation Research,2000,34A:207-222.[10] 张维迎.博弈论与信息经济学[M]. 上海:上海人民出版社,1996:431-440.
|