WEN Shu-dong, ZHENGKai-feng, HUANG Jun. “Erecting Cable before Constructing G irder”ConstructionM ethodof Self-Anchored Suspension Bridges[J]. Journal of Southwest Jiaotong University, 2005, 18(6): 750-753.
Citation: WEN Shu-dong, ZHENGKai-feng, HUANG Jun. “Erecting Cable before Constructing G irder”ConstructionM ethod of Self-Anchored Suspension Bridges[J]. Journal of Southwest Jiaotong University, 2005, 18(6): 750-753.

“Erecting Cable before Constructing G irder”ConstructionM ethod of Self-Anchored Suspension Bridges

  • Publish Date: 25 Dec 2005
  • To expand the application range of self-anchored suspension bridges, a novel construction methodwas brought up for self-anchored suspension bridges with a short span ranging from 100 to 400 m. It is called as“erecting cable before constructing girder”(ECBCG) constructionmethod and means that in the construction of a self-anchored suspension bridge the girder is constructed after the cable has been erected. Themaximum horizontal force that the piermustendurewas investigated, and some key problems, such as the size of the pier, the temporary join and the stabilization during construction, were discussed. The results show that the horizontal force can be acceptable for this type ofbridgewithin a certain range ofspan for thismethod to overcome the shortcoming of the construction method of“constructing girderbefore erecting cable”.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views(1611) PDF downloads(135) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return