| Citation: | XU Xiwu, LEI Jinshan, YANG Xiuzhu, HONG Jiamin. Experimental Study on Anchorage Performance of Improved Self-locking Prestressed Anchor Cable[J]. Journal of Southwest Jiaotong University. doi: 10.3969/j.issn.0258-2724.20250594 |
To address the issues of excessive deformation and prestress loss caused by stress concentration at the external anchor head of traditional prestressed anchor cables in fragmented rock slope reinforcement, an improved self-locking prestressed anchor cable was developed by innovating the clip structure of the self-locking device to enhance anchoring performance. Laboratory tensioning and locking tests were conducted to verify the mechanical locking effect of the improved anchor cable. Subsequently, a typical fragmented rock slope project in Zhangjiajie, Hunan Province, was selected for in-situ tensioning and locking tests. Distributed optical fiber sensing testing technology was employed to monitor the entire tensioning and locking process along the full length of the grout for three improved self-locking tension-type prestressed anchor cables. The axial strain distribution patterns of the grout at various stages were obtained, and the shear stress distribution was derived. Simultaneously, the strain of the steel pipe within the self-locking device was tested and analyzed. The results indicate that during the tensioning process, the inner anchorage section exhibits the typical mechanical characteristics of a tension-type anchor cable. The axial strain gradually develops from the proximal end of the inner anchorage section and continuously propagates backward as the load increases. At this stage, the self-locking device has no influence on the stress state of the inner anchorage section. Within 24 hours after unloading and locking, the strain distribution of the self-locking anchorage section remains stable without significant prestress loss, demonstrating excellent anchoring and locking efficacy. Because the test anchor cable comprises two anchorage units, the interaction between these units causes notable tensile strain, negative shear stress, and an increase in shear stress at the distal end of the MS1 unit. Affected by uncertainties such as on-site construction and measurement, the shear stress distribution is uneven, with a peak value of approximately 0.3 MPa, and the peak position of the MS2 unit is slightly posterior to that of the MS1 unit. In addition, the strain of the self-locking steel pipe starts from the end of the dedicated anchorage and gradually transitions from compressive strain to tensile strain with increasing distance; the strain value increases proportionally with the tensioning load. These findings provide a reference for further optimizing the support structures of fragmented rock slopes and enhancing the anchoring performance of self-locking prestressed anchor cables.
| [1] |
Gong Y F, Yao A J, Li Y L, et al. Classification and distribution of large-scale high-position landslides in southeastern edge of the Qinghai–Tibet Plateau, China[J]. Environmental Earth Sciences, 2022, 81(11): 311. doi: 10.1007/s12665-022-10433-6
|
| [2] |
Sun C Y, Chen C X, Zheng Y, et al. Assessing the stability of cable-reinforced high bedding rock slopes against rotational bi-planar failure[J]. Rock Mechanics and Rock Engineering, 2023, 56(3): 1697-1715. doi: 10.1007/s00603-022-03156-4
|
| [3] |
曾营, 张迎宾, 储峰, 等. 甘肃积石山Ms6.2级地震诱发滑坡快速评估[J]. 西南交通大学学报, 2026, 61(1): 31-40. doi: 10.3969/j.issn.0258-2724.20240041
Zeng Ying, Zhang Yingbin, Chu Feng, et al. Rapid assessment of landslides induced by Jishishan Ms6.2 earthquake in Gansu Province[J]. Journal of Southwest Jiaotong University, 2026, 61(1): 31-40. doi: 10.3969/j.issn.0258-2724.20240041
|
| [4] |
杨兵, 杨斐, 盘友峰, 等. 考虑土层倾角影响的层状堆积体基覆型边坡动力失稳研究[J/OL]. 西南交通大学学报, 2025-11-06. https://kns.cnki.net/KCMS/detail/detail.aspx?filename=XNJT20251105001&dbname=CJFD&dbcode=CJFQ.
|
| [5] |
朱淳, 龚逸非, 宋盛渊, 等. 滑坡多源监测技术及预警模型研究进展与展望[J]. 西南交通大学学报, 2025, 60(6): 1373-1389. doi: 10.3969/j.issn.0258-2724.20230547
Zhu Chun, Gong Yifei, Song Shengyuan, et al. Progress and prospects of landslide multi-source monitoring technology and early warning model[J]. Journal of Southwest Jiaotong University, 2025, 60(6): 1373-1389. doi: 10.3969/j.issn.0258-2724.20230547
|
| [6] |
谢康, 周珩, 张乐, 等. 桩基悬臂式挡墙组合结构设计理论研究[J]. 中南大学学报(自然科学版), 2021, 52(7): 2349-2359. doi: 10.11817/j.issn.1672-7207.2021.07.021
Xie Kang, Zhou Heng, Zhang (Le| Yue), et al. Theoretical research on design of combined structure of cantilever retaining wall of pile foundation[J]. Journal of Central South University (Science and Technology), 2021, 52(7): 2349-2359. doi: 10.11817/j.issn.1672-7207.2021.07.021
|
| [7] |
Liu X R, Kou M M, Feng H, et al. Experimental and numerical studies on the deformation response and retaining mechanism of h-type anti-sliding piles in clay landslide[J]. Environmental Earth Sciences, 2018, 77(5): 163. doi: 10.1007/s12665-018-7360-3
|
| [8] |
Wang H, Wang P, Qin H Y, et al. Method to control the deformation of anti-slide piles in zhenzilin landslide[J]. Applied Sciences, 2020, 10(8): 2831. doi: 10.3390/app10082831
|
| [9] |
Lin Y L, Li Y X, Zhao L H, et al. Investigation on seismic response of a three-stage soil slope supported by anchor frame structure[J]. Journal of Central South University, 2020, 27(4): 1290-1305. doi: 10.1007/s11771-020-4367-1
|
| [10] |
马洪生, 庄卫林, 范刚, 等. 预应力锚索框架加固边坡的数值分析[J]. 中外公路, 2016, 36(3): 18-21. doi: 10.14048/j.issn.1671-2579.2016.03.004
Ma Hongsheng, Zhuang Weilin, Fan Gang, et al. Numerical analysis of slope reinforced by prestressed anchor cable frame[J]. Journal of China & Foreign Highway, 2016, 36(3): 18-21. doi: 10.14048/j.issn.1671-2579.2016.03.004
|
| [11] |
赵晓彦, 黄金河, 周一文, 等. 坡面锚索与坡脚抗滑桩联合加固边坡设计方法[J]. 西南交通大学学报, 2017, 52(3): 489-495. doi: 10.3969/j.issn.0258-2724.2017.03.008
Zhao Xiaoyan, Huang Jinhe, Zhou Yiwen, et al. Joint reinforcement design method of tieback anchors on slope surface and anti-slide piles at slope toe[J]. Journal of Southwest Jiaotong University, 2017, 52(3): 489-495. doi: 10.3969/j.issn.0258-2724.2017.03.008
|
| [12] |
江昊. 锚索框架加固边坡中预应力损失对边坡稳定性及变形的影响分析[D]. 重庆: 重庆交通大学, 2013.
|
| [13] |
彭兴, 姜睿, 张玉芳, 等. 典型软弱破碎岩石边坡预应力锚索框架失效原因分析[J]. 铁道建筑, 2016, 56(3): 104-107. doi: 10.3969/j.issn.1003-1995.2016.03.26
Peng Xing, Jiang Rui, Zhang Yufang, et al. Failure causes analysis of prestressed anchor cable frame for typical weak and broken rock slope[J]. Railway Engineering, 2016, 56(3): 104-107. doi: 10.3969/j.issn.1003-1995.2016.03.26
|
| [14] |
Zhang Q, Hu J, Du Y L, et al. A laboratory and field-monitoring experiment on the ability of anti-slide piles to prevent buckling failures in bedding slopes[J]. Environmental Earth Sciences, 2021, 80(2): 44. doi: 10.1007/s12665-020-09288-6
|
| [15] |
Zhang C L, Jiang G L, Lei D, et al. Large-scale shaking table test on seismic behaviour of anti-slide pile-reinforced bridge foundation and gravel landslide: a case study[J]. Bulletin of Engineering Geology and the Environment, 2021, 80(2): 1303-1316. doi: 10.1007/s10064-020-02006-3
|
| [16] |
雷金山, 杨秀竹, 王安正, 等. 压力型锚索锚固工程原型监测与分析[J]. 铁道科学与工程学报, 2011, 8(6): 64-69. doi: 10.3969/j.issn.1672-7029.2011.06.013
Lei Jinshan, Yang Xiuzhu, Wang Anzheng, et al. Prototype monitoring and analysis of anchoring construction by pressure-dispersive cable[J]. Journal of Railway Science and Engineering, 2011, 8(6): 64-69. doi: 10.3969/j.issn.1672-7029.2011.06.013
|
| [17] |
吴志刚. 自锁型预应力锚索试验研究及设计[D]. 北京: 铁道部科学研究院, 2006.
|
| [18] |
吴志刚, 刘庆元, 王建松, 等. 自锁型预应力锚索设计原理及试验研究[J]. 四川建筑, 2009, 29(4): 71-72, 75. doi: 10.3969/j.issn.1007-8983.2009.04.031
|
| [19] |
刘庆元, 朱本珍. 自锁型预应力锚索的试验研究[J]. 铁道建筑, 2011, 51(7): 91-93. doi: 10.3969/j.issn.1003-1995.2011.07.030
|
| [20] |
刘庆元. 自锁型预应力锚索的应用[J]. 铁道建筑, 2011, 51(8): 72-75. doi: 10.3969/j.issn.1003-1995.2011.08.023
|
| [21] |
张家慧, 郭林泉, 聂彪. 营运中的高速公路高路堑边坡病害分析与加固处治实例[J]. 公路交通科技(应用技术版), 2013, 9(1): 29-33.
Zhang Jiahui, Guo Linquan, Nie Biao. Disease analysis and reinforcement treatment example of high cutting slope of expressway in operation[J]. 1, 2013, 9(1): 29-33.
|
| [22] |
熊晋, 王建松, 聂彪, 等. 一处运营高危边坡的治理工程实践[J]. 山西建筑, 2015, 41(8): 77-79. doi: 10.3969/j.issn.1009-6825.2015.08.043
Xiong Jin, Wang Jiansong, Nie Biao, et al. High hazardous slope processing engineering practice[J]. Shanxi Architecture, 2015, 41(8): 77-79. doi: 10.3969/j.issn.1009-6825.2015.08.043
|
| [23] |
胡田飞, 朱本珍, 郑静, 等. 递控式锚杆荷载传递规律的数值分析[J]. 铁道工程学报, 2013, 30(7): 11-15, 33. doi: 10.3969/j.issn.1006-2106.2013.07.003
Hu Tianfei, Zhu Benzhen, Zheng Jing, et al. Numerical analysis of load transfer mechanism of recursive control anchor[J]. Journal of Railway Engineering Society, 2013, 30(7): 11-15,33. doi: 10.3969/j.issn.1006-2106.2013.07.003
|
| [24] |
孟进宝, 郑静, 杨永鹏, 等. 递控式锚杆室内试验与光弹试验对比研究[J]. 地下空间与工程学报, 2017, 13(3): 624-630. doi: 10.20174/j.juse.2017.03.009
Meng Jinbao, Zheng Jing, Yang Yongpeng, et al. Contrast research on laboratory test and photoelastic test of delivery controlled anchor[J]. Chinese Journal of Underground Space and Engineering, 2017, 13(3): 624-630. doi: 10.20174/j.juse.2017.03.009
|
| [25] |
卢黎, 张四平, 张永兴, 等. 压力型锚索力学机理现场试验研究[J]. 岩土力学, 2010, 31(8): 2435-2440, 2458. doi: 10.3969/j.issn.1000-7598.2010.08.014
Lu Li, Zhang Siping, Zhang Yongxing, et al. Field pull-out test and behavior analysis of compression type rock anchor cables[J]. Rock and Soil Mechanics, 2010, 31(8): 2435-2440,2458. doi: 10.3969/j.issn.1000-7598.2010.08.014
|
| [26] |
余瑜, 刘新荣, 刘永权. 基坑锚索预应力损失规律现场试验研究[J]. 岩土力学, 2019, 40(5): 1932-1939. doi: 10.16285/j.rsm.2018.0013
Yu Yu, Liu Xinrong, Liu Yongquan. Field experimental investigation on prestress loss law of anchor cable in foundation pits[J]. Rock and Soil Mechanics, 2019, 40(5): 1932-1939. doi: 10.16285/j.rsm.2018.0013
|
| [27] |
GB 50021—2001 岩土工程勘察规范[2009年版][S].
|