LIU Xiaokai, LIU Xueyi, XIAO Jieling, DI Yinqiao, YANG Rongshan. Vertical Stability of Longitudinal Continuous Ballastless Track Under Temperature Variation[J]. Journal of Southwest Jiaotong University, 2018, 53(5): 921-927, 944. doi: 10.3969/j.issn.0258-2724.2018.05.007
Citation: LIU Xiaokai, LIU Xueyi, XIAO Jieling, DI Yinqiao, YANG Rongshan. Vertical Stability of Longitudinal Continuous Ballastless Track Under Temperature Variation[J]. Journal of Southwest Jiaotong University, 2018, 53(5): 921-927, 944. doi: 10.3969/j.issn.0258-2724.2018.05.007

Vertical Stability of Longitudinal Continuous Ballastless Track Under Temperature Variation

doi: 10.3969/j.issn.0258-2724.2018.05.007
  • Received Date: 21 Aug 2017
  • Publish Date: 01 Oct 2018
  • To study the vertical instability form and process of a longitudinal continuous ballastless track, the arch curve of the slab that is influenced by temperature can be deduced based on the deflection differential equation of the Euler beam. The equation of the arch camber and wavelength of the slab was obtained from the arch curve. The equilibrium path of the slab with the initial arch was analysed based on stationary potential energy. Compared with the method of assuming a deformation, the method of solving differential equations is more accurate, and the error is reduced by nearly 30%. The course can be divided into three stages: steady, expansion, and destabilization. The limit of the steady and expansion stages decreases along with the increase of the initial arch camber. The effect of the release of slab temperature on the equilibrium path shows that the path appears as a stiffening stage, and the larger the friction coefficient, the earlier the stage occurs, whereas it has little effect when the deformation is small. The larger the initial camber, the greater the allowed wavelength is. When the initial arch is smaller than 50 mm, the vertical instability of the slab does not occur.

     

  • loading
  • GERE J M, TIMOSHENKO S P. Mechanics of material[M]. New York: Van Nostrand Reinhpld. 1984: 4-15
    陈铁云,沈惠申.结构的屈曲[M]. 上海: 上海科学技术文献出版社, 1993: 9-25
    KWON I K. Analytical structural stability evaluation for h-section beams made of ordinary structural steels based on boundary conditions at high temperatures[J]. Fire Science and Engineering, 2015, 29(4): 33-38
    范峰,严佳川,曹正罡. 考虑杆件失稳影响的网壳结构稳定性研究[J]. 土木工程学报,2012(5): 8-17

    FAN Feng, Yan Jiachuan, Cao Zhenggang. Study on stability of reticulated shell structures considering the influence of member buckling[J]. China Civil Engineering Journal, 2012(5): 8-17
    班慧勇. 高强度钢材轴心受压构件整体稳定性能与设计方法研究[D]. 北京: 清华大学, 2012
    罗永峰,刘慧娟,韩庆华. 弦支穹顶结构动力稳定性分析方法[J]. 西南交通大学学报,2008,43(6): 729-735

    LUO Yongfeng, LIU Huijuan, HAN Qinghua. Analysis method of dynamic stability of suspended-dome structures[J]. Journal of Southwest Jiaotong University, 2008, 43(6): 729-735
    王骑,廖海黎,李明水,等. 大跨度桥梁颤振后状态气动稳定性[J]. 西南交通大学学报,2013,48(6): 983-988

    WANG Qi, LIAO Haili, LI Mingshui, et al. Aerodynamic stability of long-span bridges in post flutte[J]. Journal of Southwest Jiaotong University, 2013, 48(6): 983-988
    谭社会. 高温条件下CRTSⅡ型板式无砟轨道变形整治措施研究[J]. 铁道建筑,2016,5: 23-27

    TAN Shehui. Study on deformation treatment measures for crtsⅡslab-type ballastless track in high temperature condition[J]. Railway Engineering, 2016, 5: 23-27
    曾毅. 纵连式轨道板垂向稳定性研究[D]. 成都: 西南交通大学, 2014
    施若苇. 海底管道热屈曲及管土相互作用研究[D]. 杭州: 浙江大学, 2014
    HOBBS R E. In-service buckling of heated pipelines[J]. Journal of Transportation Engineering, ASCE, 1984, 110(2): 175-189
    TAYLOR N, GAN A B. Submarine pipeline buckling imperfection studies[J]. Thin-Walled Structures, 1986(4): 295-323
    HOBBS R E. The effect of soil modulus on pipeline stresses[J]. Journal of the Transportation Engineering Division,ASCE, 1980, 110(6): 775-786
    广钟岩. 铁路无缝线路[M]. 北京: 中国铁道出版社, 2005: 5-41
    闫斌,戴公连. 高速铁路斜拉桥上无缝线路纵向力研究[J]. 铁道学报,2012,34(3): 83-87

    YAN Bin, Dai Gonglian. CWR longitudinal force of cable-stayed bridge of high-speed railway[J]. Journal of the China Railway Society, 2012, 34(3): 83-87
    徐玉坡,梁晨,卢耀荣. 设计规范中统一无缝线路稳定性计算公式存在的问题分析[J]. 铁道建筑,2014(5): 124-125

    XU Yupo, LIANG Chen, LU Yaorong. The problem in unified calculating formula of CWR stability in the design specification[J]. Railway Engineering, 2014(5): 124-125
    周凌远,李乔,李彤梅,等. 改进弧长法求解屈曲问题[J]. 西南交通大学学报,2011,46(6): 922-925

    ZHOU Linyuan, Li Qiao, Li Tongmei, et al. Improved arc-length method for solving buckling problem[J]. Journal of Southwest Jiaotong University, 2011, 46(6): 922-925
    ALHAYANI A A, RODRíGUEZ J, MERODIO J. Numerical analysis of neckand bulge propagation in anisotropic tubes subject to axial loading and internal pressure[J]. Finite Elements in Analysis & Design, 2014, 90(6): 11-19
    林超. 持续高温对CRTSⅡ型板式无砟轨道温度场影响的试验研究[J]. 铁道建筑,2016(5): 15-18

    LIN Chao. Experiment study on influence of sustained high temperature on temperature field of CRTSⅡ slab-type ballastless track[J]. Railway Engineering, 2016(5): 15-18
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(12)  / Tables(2)

    Article views(494) PDF downloads(62) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return