Citation: | HE Zhengyou, FENG Ding, LIN Sheng, SUN Xiaojun. Research on Security Risk Assessment for Traction Power Supply System of High-speed Railway[J]. Journal of Southwest Jiaotong University, 2016, 29(3): 418-429. doi: 10.3969/j.issn.0258-2724.2016.03.002 |
STILLMAN R H, DARVENIZA M. Risk evaluation-power system induced bush and grass fires and the catastrophe potential[J]. IEEE Transactions on Reliability, 1991, 40(3):309-315.
|
MCCALLEY J D, VITTAL V, ABI-SAMRA N. An overview of risk based security assessment[C]//Power Engineering Society Summer Meeting. Edmonton:IEEE, 1999:173-178.
|
LI W. Risk Assessment of Power Systems:Models, Methods, and Applications[M]. New York:IEEE Press/Wiley, 2005:1-11.
|
吴俊勇. 高速铁路供电系统RAMS评估理论及其应用[M]. 北京:北京交通大学出版社,2013:164-178.
|
何剑,程林,孙元章,等. 条件相依的输变电设备短期可靠性模型[J]. 中国电机工程学报,2009,29(7):39-46. HE Jian, CHENG Lin, SUN Yuanzhang, et al. Condition dependent short-term reliability models of transmission equipment[J]. Proceedings of the CSEE, 2009, 29(7):39-46.
|
BILLINTON R, SINGH G. Application of adverse and extreme adverse weather:modelling in transmission and distribution system reliability evaluation[J]. IEE Proceedings:Generation, Transmission and Distribution, 2006, 153(1):115-120.
|
Taengko K, Bangkok, Damrongkulkamjorn, P.Risk assessment for power transformers in PEA substations using health index[C]//Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), 201310th International Conference on. Krabi, Thailand:IEEE, 2013:1-6.
|
任震,张静伟,张晋昕. 基于偏最小二乘法的设备故障率计算[J]. 电网技术,2005,29(5):12-15, 42. REN Zhen, ZHANG Jingwei, ZHANG Jinxin. Calculation of failure rate of power equipments based on partial least square method[J]. Power System Technology, 2005, 29(5):12-15,42.
|
宁辽逸,吴文传,张伯明. 运行风险评估中的变压器时变停运模型(一)基于运行工况的变压器内部潜伏性故障的故障率估计方法[J]. 电力系统自动化,2010,34(15):9-13,95. NING Liaoyi, WU Wenchuan, ZHANG Boming. Time-varying transformer outage model for operational risk assessment part one condition based failure rate estimation method for transformer internal latent fault estimation[J]. Automation of Electric Power Systems, 2010, 34(15):9-13, 95.
|
宁辽逸,吴文传,张伯明. 一种适用于运行风险评估的元件修复时间概率分布[J]. 中国电机工程学报,2009,29(16):15-20. NING Liaoyi, WU Wenchuan, ZHANG Boming. A novel probability distribution of component repair time for operation risk assessment[J]. Proceedings of CSEE, 2009, 29(16); 15-20.
|
郭创新,王越,王媚,等. 表征内部潜伏性故障的变压器时变停运模型研究[J]. 中国电机工程学报,2013,33(1):63-69. GUO Chuangxin, WANG Yue, WANG Mei, et al. Time-varying outage model for transformers representing internal latent fault[J]. Proceedings of CSEE, 2013, 33(1):63-69.
|
郭创新,何迪,张金江,等. 考虑热老化的油浸式变压器比例风险模型[J]. 电力科学与技术学报,2014,29(2):14-20, 64. GUO Chuangxin, HE Di, ZHANG Jinjiang, et al. A proportional hazard model for oil-immersed transformer concerning thermal aging[J]. Journal of Electric Power Science and Technology, 2014, 29(2):14-20, 64.
|
DAI Zhihui, WANG Zengping, JIAO Yanjun. Bayes monte-carlo assessment method of protection systems reliability based on small failure sample data[J]. IEEE Transactions on Power Delivery, 2014, 29(4):1841-1848.
|
DAI Zhihui, WANG Zengping. Protection dynamic reliability analysis system based on 3RF technique[J]. IEEE Transactions on Power Delivery, 2011, 26(3):1137-1144.
|
戴志辉,王增平,焦彦军,等. 阶段式保护原理性失效风险的概率评估方法[J]. 电工技术学报,2012,27(6):175-182. DAI Zhihui, WANG Zengping, JIAO Yanjun, et al. Probabilistic assessment method for failure risk of stepped protection philosophy[J]. Transactions of China Electrotechnical Society, 2012, 27(6):175-182.
|
齐先军,史新红,丁明,等. 电力系统元件稳态可用度的非精确统计推断[J]. 中国电机工程学报,2014,34(13):2108-2115. QI Xianjun, SHI Xinhong, DING Ming, et al.Imprecise statistical inference for steady-state availability of components in power systems[J]. Proceedings of CSEE, 2014, 34(13):2108-2115.
|
丁明,肖遥,张晶晶,等. 基于事故链及动态故障树的电网连锁故障风险评估模型[J]. 中国电机工程学报,2015,35(4):821-829. DING Ming, XIAO Yao, ZHANG Jingjing, et al. Risk assessment model of power grid cascading failures based on fault Chain and dynamic fault tree[J]. Proceedings of CSEE, 2015, 35(4):821-829.
|
陈绍宽. 铁路牵引供电系统维修计划优化模型与算法[D]. 北京:北京交通大学,2007.
|
周利军,吴广宁,汤浩,等. 计算Scott牵引变压器内部温升的热路模型法[J]. 高电压技术,2007,33(3):136-139. ZHOU Lijun, WU Guangning, TANG Hao, et al. Heat circuit method for calculating temperature rise of scott traction transformer[J]. High Voltage Engineering, 2007, 33(3):136-139.
|
韦国,闵英杰,周利军. V/X接线牵引变压器的温升特性[J]. 中国铁道科学,2011,32(3):80-85. WEI Guo, MIN Yingjie, ZHOU Lijun, et al. Temperature rise characteristics of V/X wiring traction transformer[J]. China Railway Science, 2011, 32(3):80-85.
|
杨洋,谢开贵,孙鑫. 基于FTA法的宁夏电网运行元件故障率分析[J]. 电力系统保护与控制,2009,37(18):134-137,141. YANG Yang, XIE Kaigui, SUN Xin. Operating component failure rate analysis based on FTA for power system[J]. Power System Protection and Control, 2009, 37(18):134-137, 141.
|
王磊,赵书强,张明文. 考虑天气变化的输电系统可靠性评估[J]. 电网技术,2011,35(7):66-70. WANG Lei, ZHAO Shuqiang, ZHANG Mingwen. Reliability evaluation of transmission system considering weather change[J]. Power System Technology, 2011, 35(7):66-70.
|
谢云云,薛禹胜,文福拴,等. 冰灾对输电线故障率影响的时空评估[J]. 电力系统自动化,2013,37(18):32-41, 98. XIE Yunyun, XUE Yuesheng, WEN Fushuang,et al. Space-time evaluation for impact of disaster on transmission line fault probability[J]. Automation of Electric Power Systems, 2013, 37(18):32-41, 98.
|
赵淳,陈家宏,王剑,等. 电网雷害风险评估技术研究[J]. 高电压技术,2011,37(12):3012-3021. ZHAO Chun, CHEN Jiahong, WANG Jian, et al.Research on technology of lightning disaster risk assessment for power system[J]. High Voltage Technology, 2011, 37(12):3012-3021.
|
王博,游大海,尹项根,等. 基于多因素分析的复杂电力系统安全风险评估体系[J]. 电网技术,2011,35(1):40-45. WANG Bo, YOU Dahai, Yin Xianggen, et al. A security risk assessment system of complicated power grid based on multiple factor analysis[J]. Power System Technology, 2011, 35(1):40-45.
|
熊小伏,翁世杰,王建,等. 电网台风风险预警系统方案设计[J]. 重庆大学学报,2014,37(7):27-32. XIONG Xiaofu, WENG Shijie, WANG Jian, et al. Reseach and application of typhoon risk early warning system for power grid[J]. Journal of Chongqing University, 2014, 37(7):27-32.
|
熊小伏,翁世杰,王建,等. 考虑降雨修正的干字型耐张塔跳线风偏放电在线预警方法[J]. 电力系统保护与控制,2015,43(5):136-143. XIONG Xiaofu, WENG Shijie, WANG Jian, et al. An online early warning method for windage yaw discharge of jumper towards JG type strain tower considering corrected by rainfall[J]. Power System Protection and Control, 2015, 43(5):136-143.
|
熊小伏,王尉军,于洋,等. 多气象因素组合的输电线路风险分析[J]. 电力系统及其自动化学报,2011,23(6):11-15,28. XIONG Xiaofu, WANG Weijun, YU Yang, et al. Risk analysis method for transmission line combing of various meteorological factors[J]. Proceedings of the CSU-EPSA, 2011, 23(6):11-15, 28.
|
熊小伏,恭秀芬,王燕祥. 输电网可靠性评估中基于气象因素的处理方法[J]. 电力系统保护与控制,2013,41(11):32-37. XIONG Xiaofu, GONG Caifeng, WANG Yanxiang. A method for transmission network reliability evaluation considering meteorological factors[J]. Power System Protection and Control, 2013, 41(11):32-37.
|
程宏波,何正友,胡海涛,等. 高速铁路牵引供电系统雷电灾害风险评估及预警[J]. 铁道学报,2013,35(5):21-26. CHENG Hongbo, HE Zhengyou, HU Haitao, et al. Risk assessment and early warning of lightning disaster for traction power supply system of high-speed railway[J]. Journal of the China Railway Society, 2013, 35(5):21-26.
|
周利军,高峰,李瑞芳,等. 高速铁路牵引供电系统雷电防护体系[J]. 高电压技术,2013,39(2):399-406. ZHOU Lijun, GAO Feng, LI Ruifang, et al. Lightning protection system of traction power supply system for high-speed railway[J]. High Voltage Engineering, 2013, 39(2):399-406.
|
曹晓斌,熊万亮,吴广宁,等. 接触网引雷范围划分及跳闸率的计算方法[J]. 高电压技术,2013,39(6):1515-1521. CAO Xiaobin, XIONG Wanliang, WU Guangning, et al. Lightning scope division and lightning trip-out rate calculation method for overhead catenary system[J]. High Voltage Engineering, 2013, 39(6):1515-1521.
|
边凯,陈维江,王立天,等. 高速铁路牵引供电接触网雷电防护[J]. 中国电机工程学报,2013,33(10):191-199. BIAN Kai, CHEN Weijiang, WANG Litian, et al. Lightning protection of traction power supply catenary of high-speed railway[J]. Proceedings of the CSEE, 2011, 33(10):31-34.
|
边凯,陈维江,沈海滨,等. 高速铁路牵引供电接触网用带间隙避雷器的研制[J]. 中国电机工程学报,2013,33(10):200-209. BIAN Kai, CHEN Weijiang, SHEN Haibin, et al. Development of metal oxide surge arrester with series gap for traction power supply system catenary of high-speed electrified[J]. Proceedings of the CSEE, 2013, 33(10):200-209.
|
谷山强,冯万兴,赵淳,等. 高速铁路牵引网雷害风险评估方法[J]. 高电压技术,2015,41(5):1526-1535. GU Shanqiang, FENG Wanxing, ZHAO Chun, et al. Method of lightning hazard risk evaluation for traction electric network of high-speed railway[J]. High Voltage Engineering, 2015, 41(5):1526-1535.
|
王勇喆. 考虑恶劣天气影响的铁路牵引供电系统风险评估[D]. 北京:北京交通大学,2010.
|
魏喆,肖晓晖,童雪梅,等. 铁路牵引供电系统接触网结构的防灾分析[J]. 铁道学报,2011,33(6):31-34. WEI Zhe, XIAO Xiaohui, TONG Xuemei, et al. Analysis on disaster prevention of structure of catenary in railway traction power supply system[J]. Journal of the China Railway Society, 2011, 33(6):31-34.
|
YAROSLAVTSEV M A, LEVCHENKOV A. Modeling the integration of expert systems into railway electric transport safety control[C]//The 10th International Symposium Topical Problems in the Field of Electrical and Power Engineering. Estonia:Practitioner, 2011:10-15.
|
何正友,程宏波. 高速铁路牵引供电系统健康管理及故障预警体系研究[J].电网技术,2012,36(10):259-264. HE Zhengyou, CHENG Hongbo. Research on health management and early warning system for traction power supply system of high-speed railway[J]. Power System Technology, 2012, 36(10):259-264.
|
张力强,罗文杰,吕利军. 电气化铁路牵引负荷的不利影响及治理方案[J]. 电网技术,2006,30(增刊):196-198. ZHANG Liqiang, LUO Wenjie, L Lijun. Disadvantage and manage project on electrization railway draught load[J]. Power System Technology, 2006, 30(Sup.):196-198.
|
何正友,胡海涛,方雷,等. 高速铁路牵引供电系统谐波及其传输特性研究[J]. 中国电机工程学报,2011,31(16):55-62. HE Zhengyou, HU Haitao, FANG Lei, et al. Research on the harmonic in high-speed railway traction power supply system and its transmission characteristic[J]. Proceedings of the Chinese Society for Electrical Engineering, 2011, 31(16):55-62.
|
FU W, MCCALLEY J D, VITTAL V. Risk assessment for transformer loading[J]. IEEE Transactions on Power Systems, 2001, 21:58-58.
|
KAMATA Y, ENDOH K, FURUKAWA S, et al.Dielectric strength of oil-immersed transformer insulation with superimposed AC and lightning impulse voltage[J]. IEEE Transactions on Electrical Insulation, 1990, 25:683-687.
|
王建学,高卫恒,别朝红,等. 冲击负荷对电力系统可靠性影响的分析[J]. 中国电机工程学报,2011,31(10):59-65. WANG Jianxue, GAO Weiheng, BIE Zhaohong. Influence of shock loads on power system reliability[J]. Proceedings of the Chinese Society for Electrical Engineering, 2011, 31(10):59-65.
|
周利军,吴广宁. 牵引负荷对变压器绝缘老化和寿命损失的影响[J]. 电力系统自动化,2005,29(18):90-94. ZHOU Lijun, WU Guangning. Effect of traction loads on insulation aging and loss-of-life of transformers[J]. Automation of Electric Power Systems, 2005, 29(18):90-94.
|
ZHOU L J, WU G N, YU J F, et al.Thermal overshoot analysis for hot-spot temperature rise of transformer[J]. Dielectrics and Electrical Insulation, IEEE Transactions on, 2007, 14:1316-1322.
|
DEOKAR S A, WAGHMARE L M. Impact of power system harmonics on insulation failure of distribution transformer and its remedial measures[C]//International Conference on Electronics Compute Technology,:IEEE, 2011:136-140.
|
DIGALOVSKI M, NAJDENKOSKI K, RAFAJLOVSKI G. Impact of current high order harmonic to core losses of three-phase distribution transformer[J]. Eurocon, 2013:1531-1535.
|
IVY J S, NEMBHARD H B. A modeling approach to maintenance decisions using statistical quality control and organization[J]. Quality and Reliability Engineering International, 2005, 21:355-366.
|
Bertolini Massimo, Bevilacqua Maurizio. A combined goal programming-AHP approach to maintenance selection problem[J]. Reliability Engineering amp; System Safety, 2006, 91(7):839-848.
|
CASTANIER B, GRALL A. A condition-based maintenance policy with non-periodic inspections for a two-unit series system[J]. Reliability Engineering System Safety, 2005, 87:109-120.
|
WANG Wenbin. A two-stage prognosis model in condition based maintenance[J]. European Journal of Operational Research, 2007, 182:1177-1187.
|
KALLEN M J, VAN NOORTWIJK J M. Optimal maintenance decisions under imperfect inspection[J]. Reliability Engineering and System Safety, 2005, 90(2):177-185.
|
CHEN D Y, KISHOR S T. Optimization for condition-based maintenance with semi-markov decision process[J]. Reliability Engineering and System Safety, 2005, 90(1):25-29.
|
ENDRENYI J, ANDERS G J. Aging, maintenance, and reliability-approaches to preserving equip ment health and extending equipment life[J]. IEEE Power and Energy Magazine, 2006, 4(3):59-67.
|
TSAI Y T, WANG K S, TSAI L C. A study of availability-centered preventive maintenance for multi- component systems[J]. Reliability Engineering and System Safety, 2004, 84(3):261-270.
|
BERTLING L, ALLAN R, ERIKSSON R. A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems[J]. IEEE Transactions on Power Systems, 2005, 20(1):75-82.
|
潘乐真,张焰,俞国勤,等. 状态检修决策中的电气设备故障率推算[J]. 电力自动化设备,2010,30(2):91-94. PAN Lezhen, ZHANG Yan, YU Guoqin, et al. Prediction of electrical equipment failure rate for condition-basedmaintenance decision-making[J]. Electric Power Automation Equipment, 2010, 30(2):91-94.
|
李明,韩学山,王勇,等. 变电站状态检修决策模型与求解[J]. 中国电机工程学报,2012,32(25):196-202. LI Ming, HAN Xueshan, WANG Yong, et al. Decision-making model and solution of condition-based maintenance for substation[J]. Proceedings of the CSEE, 2012, 32(25):196- 202.
|
熊小伏,李磊,方丽华,等. 基于可靠性和气象因素的配电网短期维修决策方法[J]. 电力系统保护与控制,2013,41(20):61-64. XIONG Xiaofu, LI Lei, FANG Lihu, et al. A decision method of short-term distribution network maintenance schedule based on reliability and meteorological factors[J]. Power System Protection and Control, 2013, 41(20):61-64.
|
夏莹,周家启,熊小伏,等. 基于短期气象预报的输电设备维修风险分析方法[J]. 电力系统保护与控制,2010,38(11):44-47. XIA Ying, ZHOU Jiaqi, XIONG Xiaofu, et al. Method for maintenance risk analysis of transmission facility based on short-term meteorological forecast[J]. Power System Protection and Control, 2010, 38(11):44-47.
|
王瑞祥,夏莹,熊小伏. 计及气象因素的输电线路维修风险分析[J]. 电网技术,2010,34(1):219-222. WANG Ruixiang, XIA Ying, XIONG Xiaofu. Risk analysis method for transmission line maintenance considering meteorological factors[J]. Power System Technology, 2010, 34(1):219-222.
|
冯永青,张伯明,吴文传,等. 基于可信性理论的电力系统运行风险评估(一)运行风险的提出与发展[J]. 电力系统自动化,2006,30(1):17-23. FENG Yongqing, ZHANG Boming, WU Wenchuan, et al. Power system operation risk assessment based on credibility theory part one propound and development of operation risk assessment[J]. Automation of Electric Power Systems, 2006, 30(1):17-23.
|
冯永青,吴文传,张伯明,等. 基于可信性理论的水火电机组检修计划[J]. 中国电机工程学报,2006,26(13):14-19. FENG Yongqing, WU Wenchuan, ZHNAG Boming, et al. Hydro-thermal generator maintenance scheduling based on credibility theory[J]. Proceedings of CSEE, 2006, 26(13):14-19.
|
冯永青,吴文传,张伯明,等. 基于可信性理论的输电网短期线路检修计划[J]. 中国电机工程学报,2007,27(4):65-71. FENG Yongqing, WU Wenchuan, ZHANG Boming, et al. Short-term transmission line maintenance scheduling based on credibility theory[J]. Proceedings of CSEE, 2007, 27(4):65-71.
|
杨媛. 高速铁路供电系统RAMS评估的研究[D]. 北京:北京交通大学,2011.
|
李雪,吴俊勇,杨媛,等. 高速铁路接触网悬挂系统维修计划的优化研究[J]. 铁道学报,2010,32(2):24-30. LI Xue, WU Junyong, YANG Yuan, et al. Research on optimization of catenary system maintenance schedule for high-speed railways[J]. Journal of The China Ralyway Sociey, 2010, 32(2):24-30.
|
陈绍宽,彭宏勤,毛保华,等. 基于费用最小的铁路牵引变电所维修计划优化模型[J]. 铁道学报,2011,33(8):39-44. CHEN Shaokuan, PENG Hongqin, MAO Baohua, et al. Optimization model of least-cost-based maintenance schedules for railway traction substations[J]. Journal of the China Railway Society, 2011, 33(8):39-44.
|
陈绍宽,王秀丹,柏赟,等. 基于费用最小的铁路牵引接触网维修计划优化模型[J]. 铁道学报,2013,35(12):37-42. CHEN Shaokuan, WANG Xiudan, BAI Yun, et al. Optimization model of least-cost-based maintenance schedules for railway traction substations[J]. Journal of The China Ralyway Sociey, 2013, 35(12):37-42.
|
吴冰. 澳大利亚越网电力公司信息化建设概况[J]. 电力信息化,2006,4(5):97-100. WU Bing. Electric enterprises construction condition in australia[J]. Electric Power Information Technology, 2006, 4(5):97-100.
|
HUGHES D, PEARS T, TIAN Y. Linking engineering knowledge and practical experience to investment planning by means of condition based risk management[C]//Condition Monitoring and Diagnosis. China:IEEE, 2008:539-542.
|
BALZCR G, BAKIC K, HAUBRICH H, et al.Selection of an optimal maintenance and replacement strategy of hv equipment by a risk assessment process[C]//CIGRE Session. Paris:CIGRE, 2006:3-103.
|
秦继承,吴娟. 基于电网状态评估的风险防范管理体系应用研究[J]. 中国电力,2007,40(4):90-92. QIN Jicheng, WU Juan. Application research of risk management system based on condition assessment of power grid[J]. Electric Power, 2007, 40(4):90-92.
|
国家电网公司. Q/GDW 171-2008. 输变电设备风险评估导则(试行)[S]. 北京:国家电网公司,2008.
|