Citation: | LIU Chenglong, JIN Guoqing, YANG Xuefeng, WANG Changjin, XU Xiaozuo. Using Free-Station Linear-Angular Intersection Network in Tunnel Horizontal Survey of High-Speed Railway[J]. Journal of Southwest Jiaotong University, 2014, 27(1): 1-7. doi: 10.3969/j.issn.0258-2724.2014.01.001 |
刘成龙, 王鹏. 基于坐标协因数阵的GPS网隧道横向贯通中误差严密计算方法研究[J]. 铁道学报, 2009, 31(1): 74-77. LIU Chenglong, WANG Peng. Study on calculating rigorously lateral link-up error in GPS tunnel control network based on variance-covariance matrix of coordinates[J]. Journal of the China Railway Society, 2009, 31(1): 74-77.
|
张正禄, 张松林, 伍志刚, 等. 20~50 km超长隧道(洞)横向贯通误差允许值研究[J]. 测绘学报, 2004, 33(1): 83-88. ZHANG Zhenglu, ZHANG Songlin, WU Zhigang, et al. Research on the allowable value of lateral breakthough error for super long tunnel from 20 to 50 km[J]. Acta Geodaetica et Cartographica Sinica, 2004, 33(1): 83-88.
|
张正禄. 论隧道施工三角网和边角网测量误差对横向贯通误差的影响和网的最优化设计[J]. 测绘学报, 1982, 11(3): 203-214. ZHANG Zhenglu. Discussion on the lateral break-though error of tunnel caused by surveying errors of triangulation or triangulateraion network for setting out and on the optimization of this network[J]. Acta Geodaetica et Cartographica Sinica, 1982, 11(3): 203-214.
|
刘成龙, 杨友涛, 徐小左. 高速铁路CPⅢ交会网必要测量精度的仿真计算[J]. 西南交通大学学报, 2008, 43(6): 718-723. LIU Chenglong, YANG Youtao, XU Xiaozuo. Simulated determination of accuracy requirement for control points Ⅲ intersection networks in high-speed railway[J]. Journal of Southwest Jiaotong University, 2008, 43(6): 718-723.
|
王兆祥, 傅晓村, 卓健成. 铁路工程测量[M]. 北京:测绘出版社, 1986: 310-311.
|
王国昌, 徐小左, 刘成龙. 高速铁路CPⅢ平面网的闭合差研究及其应用[J]. 铁道学报, 2009, 31(5): 79-83. WANG Guochang, XU Xiaozuo, LIU Chenglong. Research and application of closure for high speed railway CPⅢ plane network[J]. Journal of the China Railway Society, 2009, 31(5): 79-83.
|
邓川. 现代长大隧道洞内控制测量与监测技术研究[D]. 成都:西南交通大学, 2012: 18-30.
|
王晓红, 侯文广. 减少特长隧洞横向贯通误差的导线布设方法[J]. 矿山测量, 2005(3): 39-40. WANG Xiaohong, HOU Wenguang. The method of laying traverses to reduce the through error of the extra-long tunnel[J]. Mine Surveying, 2005(3): 39-40.
|
李书亮, 刘成龙, 倪先桃, 等. 高速铁路CPⅢ高程控制网测量方法研究[J]. 测绘科学, 2011, 36(1): 45-47. LI Shuliang, LIU Chenglong, NI Xiantao, et al. Surveying method of CPⅢ vertical control network in high-speed railway[J]. Science of Surveying and Mapping, 2011, 36(1): 45-47.
|
夏艳平, 郭良浩, 刘成龙, 等. 基于自由测站的大跨度连续梁上CPⅡ平面网测量方法研究[J]. 工程勘察, 2011, 37(6): 6-8. XIA Yanping, GUO Lianghao, LIU Chenglong, et al. Research on CPⅡ plane control network surveying for long-span continuous beams based on free-station measurement method[J]. Railway Investigation and Surveying, 2011, 37(6): 6-8.
|
朱颖, 卢建康, 程昂, 等. TB 10601—2009 高速铁路工程测量规范[S]. 北京:中国铁道出版社, 2009.
|
武汉大学测绘学院测量平差学科组. 误差理论与测量平差基础[M]. 武汉:武汉大学出版社, 2005: 107-119.
|
崔希璋, 於宗俦, 陶本藻, 等. 广义测量平差[M]. 武汉:武汉大学出版社, 2009: 102-103.
|