Citation: | HU Lan, HU Pei. Relation and Risk in Owner and Contractors of Tunnel Projects Based on Probability and Logic Theories[J]. Journal of Southwest Jiaotong University, 2013, 26(6): 1122-1128. doi: 10.3969/j.issn.0258-2724.2013.06.024 |
中华人民共和国铁道部. 中长期铁路网调整规划方案
|
上海土木工程学会. 地下及隧道工程事故和风险控制技术资料汇编
|
[R/OL]. (2008-11-27)
|
钱七虎, 戎晓力. 中国地下工程安全风险管理的现状、问题及相关建议
|
[M]. 上海:上海科学技术出版社, 2009: 258-261.
|
EINSTEIN H H, VICK S G. Geological model for tunnel cost model
|
EINSTEIN H H. Risk and risk analysis in rock engineering
|
[J]. 岩石力学与工程学报, 2008, 27(4): 649-655. QIAN Qihu, RONG Xiaoli. State, issues and relevant recommendations for security risk management of china's underground engineering
|
ESKESEN S D, TENGBOR G P, KAMPMAN N J, et al. Guidelines for tunnelling risk management: international tunnelling association, working group No.2
|
[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(4): 649-655.
|
黄宏伟, 边亦海. 深基坑工程施工中的风险管理
|
黄宏伟, 彭铭, 胡群芳. 上海长江隧道工程风险评估研究
|
[C]//Proceedings of Rapid Excavation and Tunneling Conf. San Francisco: Soc. of Min. Eng. of AIME, 1974(2): 1701-1720.
|
许振浩, 李术才, 李利平, 等. 基于层次分析法的岩溶隧道突水突泥风险评估
|
张顶立, 李兵, 房倩, 等. 基于风险系数的海底隧道纵断面确定方法
|
盛聚, 谢式千, 潘承毅. 概率论与数理统计
|
[J]. Tunneling and Underground Space Technology, 1996, 2(11): 141-155.
|
吴铭. 模糊事故树分析及其在施工安全管理中的应用
|
[J]. Tunnelling and Underground Space Technology, 2004, 19(3): 217-237.
|
中华人民共和国铁道部. 铁建设
|
The Association of British Insurers, The British Tunnelling Society. The joint code of practice for risk assessment of tunnel works in the UK
|
[J]. 地下空间与工程学报, 2005, 1(4): 611-614. HUANG Hongwei, BIAN Yihai. Risk management in the construction of deep excavation engineering
|
[J]. Chinese Journal of Underground Space and Engineering, 2005, 1(4): 611-614.
|
[J]. 地下空间与工程学报, 2009, 5(1): 182-187. HUANG Hongwei, PENG Ming, HU Qunfang. Risk assessment on Shanghai Yangtze River tunnel
|
[J]. Chinese Journal of Underground Space and Engineering, 2009, 5(1): 182-187.
|
[J]. 岩土力学, 2011, 32(6): 1757-1766. XU Zhenhao, LI Shucai, LI Liping, et al. Risk assessment of water or mud inrush of karst tunnels based on analytic hierarchy process
|
[J]. Rock and Soil Mechanics, 2011, 32(6): 1757-1766.
|
[J]. 岩石力学与工程学报, 2009, 28(1): 9-19. ZHANG Dingli, LI Bing, FANG Qian, et al. method for determining longitudinal section of subsea tunnel based on risk coefficient
|
[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(1): 9-19.
|
[M]. 3版. 北京:高等教育出版社, 2001: 80-88.
|
[D]. 天津:天津大学, 2004.
|
[S]. 北京:中国铁道出版社, 2007.
|
[S]. London: The British Tunnelling Society, 2003.
|
200号铁路隧道风险评估与管理暂行规定
|