• ISSN 0258-2724
  • CN 51-1277/U
  • EI Compendex
  • Scopus
  • Indexed by Core Journals of China, Chinese S&T Journal Citation Reports
  • Chinese S&T Journal Citation Reports
  • Chinese Science Citation Database
Volume 25 Issue 4
Aug.  2012
Turn off MathJax
Article Contents
FANG Tao, LIU Xinrong, GENG Daxin, DIAO Xinhong. Comprehensive Assessment Method for Health Status of Subgrade in Existing Line Speed-Raising Reconstruction[J]. Journal of Southwest Jiaotong University, 2012, 25(4): 591-596. doi: 10.3969/j.issn.0258-2724.2012.04.009
Citation: FANG Tao, LIU Xinrong, GENG Daxin, DIAO Xinhong. Comprehensive Assessment Method for Health Status of Subgrade in Existing Line Speed-Raising Reconstruction[J]. Journal of Southwest Jiaotong University, 2012, 25(4): 591-596. doi: 10.3969/j.issn.0258-2724.2012.04.009

Comprehensive Assessment Method for Health Status of Subgrade in Existing Line Speed-Raising Reconstruction

doi: 10.3969/j.issn.0258-2724.2012.04.009
  • Received Date: 10 May 2011
  • Publish Date: 25 Aug 2012
  • To deal with the speed-raising reconstruction for an existing railway line, the health status of the subgrade of the line need to be assessed first. On the basis of a field investigation of the subgrade damage, the subgrade was divided into 24 segments to be tested according to the severity of subgrade damage, filling material, and the structure of subgrade bed. A total of 754 groups of compaction tests, 345 groups of dynamic elastic modulus tests, and 1 311 groups of light dynamic penetration tests on different positions were conducted, and the test results were analyzed. The analysis indicates that the comprehensive assessment method for health status of subgrade, which combines light dynamic penetration and compaction tests with dynamic elastic modulus tests based on a field investigation, can adequately reflect the strength, rigidity, and durability of subgrade. This method is proved to be reliable, and the test results by it can be directly applied to the design of the technical scheme of subgrade reconstruction.

     

  • loading
  • 杨新安,周青.铁路路基病害与动力触探试验研究[J]. 中国矿业大学学报,2002,31(4): 358-359. YANG Xin'an, ZHOU Qing. Shanghai-Nanjing railway embankment settlement and dynamic penetration test[J]. Journal of China University of Mining & Technology, 2002, 31(4): 358-359.
    廖立坚,杨新安,杜攀峰. 铁路路基雷达探测数据的处理[J]. 中国铁道科学,2008,29(3): 18-23. LIAO Lijian, YANG Xinan, DU Panfeng. Processing GPR detection data of railway subgrade[J]. China Railway Science, 2008, 29(3): 18-23.
    杜攀峰,廖立坚,杨新安. 铁路路基病害的智能识别[J]. 铁道学报,2010,32(3): 142-146. DU Panfeng, LIAO Lijian, YANG Xin'an. Intelligent recognition of defects in railway subgrade[J]. Jounal of the China Railway Society, 2010, 32(3): 142-146.
    刘杰. 探地雷达技术在铁路既有线中的应用[J]. 铁道建筑,2006,22(10): 77-78. LIU Jie. Application of geophysical radar technology to inspecting existing railway[J]. Railway Engineering, 2006, 22(10): 77-78.
    谢勇勇,廖红建,昝月稳. 探地雷达检测铁路路基病害的二维正演模拟[J]. 浙江大学学报:工学版,2010,44(10): 1907-1911. XIE Yongyong, LIAO Hongjian, ZAN Yuewen.Two-dimensional forward simulation of railway roadbed disease based on ground penetrating radar technique[J]. Journal of Zhejiang University: Engineering Science, 2010, 44(10): 1907-1911.
    杨新安,高艳灵. 沪宁铁路翻浆冒泥病害的地质雷达检测[J]. 岩石力学与工程学报,2004,23(1): 116-119. YANG Xin'an, GAO Yanling. GPR inspection for shanghai-nanjing railway trackbed[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(1): 116-119
    吴世明. 土介质中的波[M]. 北京:科学出版社,1997: 27-61.
    杨成林. 瑞雷波勘探[M]. 北京:地质出版社,1993: 129-173.
    张志耕. 瑞雷面波法在路基质量检测中的应用[J]. 水文地质工程地质,2006(5): 117-118. ZHANG Zhigeng, YAN Shuwang, CUI Wei. Application of rayleigh wave method in inspection of roadbed disease[J]. Hydrogeology & Engineering Geology, 2006(5): 117-118
    王超凡,高海伟,刘志强,等. 利用瑞雷波法评价既有铁路路基[J]. 工程地质学报,2002,10(3): 313-316. WANG Chaofan, GAO Haiwei, LIU Zhi qiang, et al. Using rayleigh-wave method to evaluate xisting rail road foundation[J]. Journal of Engineering Geology, 2002, 10(3): 313-316.
    GERARD G, QUENTIN L, MAXWELL C. Ballast evaluation using ground-penetrating radar[J]. Railway Gazette International, 2000(2): 188-189.
    SELIG E T. Ballast deformation: its causes and cures[J]. Railway Track And Structures, 1998, 94(5): 25-30.
    HUGENSCHMIDT J. Railway track inspection using GPR[J]. Journal of Applied Geophysics, 2000, 43(2/4): 147-155.
    邓学欣,王太勇,任成祖,等. 压实度自动检测技术及其应用[J]. 西南交通大学学报,2003,38(5): 505-508. DENG Xuexin, WANG Taiyong, REN Chengzu, et al. Auto-testing technology of compaction degree and its application[J]. Journal of Southwest Jiaotong University, 2003, 38(5): 505-508.
    中华人民共和国铁道部. 铁科技
    曹新文,罗强,薜双纲. 土工格室和土工网加固基床效果静态模型试验[J]. 西南交通大学学报,2001,36(3): 322-326. CAO Xinwen, LUO Qiang, XUE Shuanggang. Model test of the effects of geocells and geonets on subgrade strengthening under static loads[J]. Journal of Southwest Jiaojong University, 2001, 36(3): 322-326.
    222号 铁路200~250 km/h既有线技术管理办法[S]. 北京:,2008.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views(1117) PDF downloads(327) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return