Citation: | FANG Tao, LIU Xinrong, GENG Daxin, DIAO Xinhong. Comprehensive Assessment Method for Health Status of Subgrade in Existing Line Speed-Raising Reconstruction[J]. Journal of Southwest Jiaotong University, 2012, 25(4): 591-596. doi: 10.3969/j.issn.0258-2724.2012.04.009 |
杨新安,周青.铁路路基病害与动力触探试验研究[J]. 中国矿业大学学报,2002,31(4): 358-359. YANG Xin'an, ZHOU Qing. Shanghai-Nanjing railway embankment settlement and dynamic penetration test[J]. Journal of China University of Mining & Technology, 2002, 31(4): 358-359.
|
廖立坚,杨新安,杜攀峰. 铁路路基雷达探测数据的处理[J]. 中国铁道科学,2008,29(3): 18-23. LIAO Lijian, YANG Xinan, DU Panfeng. Processing GPR detection data of railway subgrade[J]. China Railway Science, 2008, 29(3): 18-23.
|
杜攀峰,廖立坚,杨新安. 铁路路基病害的智能识别[J]. 铁道学报,2010,32(3): 142-146. DU Panfeng, LIAO Lijian, YANG Xin'an. Intelligent recognition of defects in railway subgrade[J]. Jounal of the China Railway Society, 2010, 32(3): 142-146.
|
刘杰. 探地雷达技术在铁路既有线中的应用[J]. 铁道建筑,2006,22(10): 77-78. LIU Jie. Application of geophysical radar technology to inspecting existing railway[J]. Railway Engineering, 2006, 22(10): 77-78.
|
谢勇勇,廖红建,昝月稳. 探地雷达检测铁路路基病害的二维正演模拟[J]. 浙江大学学报:工学版,2010,44(10): 1907-1911. XIE Yongyong, LIAO Hongjian, ZAN Yuewen.Two-dimensional forward simulation of railway roadbed disease based on ground penetrating radar technique[J]. Journal of Zhejiang University: Engineering Science, 2010, 44(10): 1907-1911.
|
杨新安,高艳灵. 沪宁铁路翻浆冒泥病害的地质雷达检测[J]. 岩石力学与工程学报,2004,23(1): 116-119. YANG Xin'an, GAO Yanling. GPR inspection for shanghai-nanjing railway trackbed[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(1): 116-119
|
吴世明. 土介质中的波[M]. 北京:科学出版社,1997: 27-61.
|
杨成林. 瑞雷波勘探[M]. 北京:地质出版社,1993: 129-173.
|
张志耕. 瑞雷面波法在路基质量检测中的应用[J]. 水文地质工程地质,2006(5): 117-118. ZHANG Zhigeng, YAN Shuwang, CUI Wei. Application of rayleigh wave method in inspection of roadbed disease[J]. Hydrogeology & Engineering Geology, 2006(5): 117-118
|
王超凡,高海伟,刘志强,等. 利用瑞雷波法评价既有铁路路基[J]. 工程地质学报,2002,10(3): 313-316. WANG Chaofan, GAO Haiwei, LIU Zhi qiang, et al. Using rayleigh-wave method to evaluate xisting rail road foundation[J]. Journal of Engineering Geology, 2002, 10(3): 313-316.
|
GERARD G, QUENTIN L, MAXWELL C. Ballast evaluation using ground-penetrating radar[J]. Railway Gazette International, 2000(2): 188-189.
|
SELIG E T. Ballast deformation: its causes and cures[J]. Railway Track And Structures, 1998, 94(5): 25-30.
|
HUGENSCHMIDT J. Railway track inspection using GPR[J]. Journal of Applied Geophysics, 2000, 43(2/4): 147-155.
|
邓学欣,王太勇,任成祖,等. 压实度自动检测技术及其应用[J]. 西南交通大学学报,2003,38(5): 505-508. DENG Xuexin, WANG Taiyong, REN Chengzu, et al. Auto-testing technology of compaction degree and its application[J]. Journal of Southwest Jiaotong University, 2003, 38(5): 505-508.
|
中华人民共和国铁道部. 铁科技
|
曹新文,罗强,薜双纲. 土工格室和土工网加固基床效果静态模型试验[J]. 西南交通大学学报,2001,36(3): 322-326. CAO Xinwen, LUO Qiang, XUE Shuanggang. Model test of the effects of geocells and geonets on subgrade strengthening under static loads[J]. Journal of Southwest Jiaojong University, 2001, 36(3): 322-326.
|
222号 铁路200~250 km/h既有线技术管理办法[S]. 北京:,2008.
|