Citation: | QI Taiyue, BAI Yongxue, LI Bin. Optimization of Complex Cross-Section Metro Tunnel Excavation and Its Influence on Building[J]. Journal of Southwest Jiaotong University, 2012, 25(1): 68-77. doi: 10.3969/j.issn.0258-2724.2012.021.01.012 |
张建国,王明年,刘大刚,等. 海底隧道浅埋暗挖段CRD法不同施工工序比较[J]. 岩石力学与工程学报,2007,26(增刊2): 3639-3645. ZHANG Jianguo, WANG Mingnian, LIU Dagang, et al. Comparison of different working procedures by CRD method for shallow-buried subsea tunnel excavation[J. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(Sup.2): 3639-3645.
[2] 黄明琦,付贤伦,李云超. 大断面海底隧道软弱地层CRD法施工稳定性控制研究[J.] 岩石力学与工程学报,2007,26(增刊2): 3804-3809. HUANG Mingqi, FU Xianlun, LI Yunchao. Study on stability control of large-section subsea tunnels in weak strata by CRD construction method[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(Sup.2): 3804-3809.
[3] 覃卫民,李祺,任伟中,等. 复杂结构形式隧道的围岩位移监测分析[J]. 岩石力学与工程学报,2010,29(3): 549-557. QIN Weimin, LI Qi, REN Weizhong, et al. Monitoring analysis of surrounding rock displacement of complex structure tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(3): 549-557.
[4] 漆泰岳,刘强,琚国全. 软弱岩层大跨度地铁车站施工优化与地表沉降控制[J]. 岩石力学与工程学报,2010,29(4): 804-813. QI Taiyue, LIU Qinag, JU Guoquan. Optimization of large-span metro station construction in soft rock strata and control of ground surface subsidence[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(4): 804-813.
[5] 施成华,彭立敏,刘宝琛. 浅埋隧道开挖对地表建筑物的影响[J. 岩石力学与工程学报,2004,23(19): 3310-3316. SHI Chenghua, PENG Limin, LIU Baochen. Influence of shallow tunnel excavation on ground surface buildings[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(19): 3310-3316.
[6] 张平良,方信贤,张运良,等. 基于地表沉降控制标准的隧道施工安全评估[J]. 铁道工程学报,2010(5): 48-53. ZHANG Pingliang, FANG Xinxian, ZHANG Yunliang, et al. Safety assessment of tunneling based on surface settlement standard[J]. Journal of Railway Engineering Society, 2010(5): 48-53.
[7] 齐震明,李鹏飞. 地铁区间浅埋暗挖隧道地表沉降的控制标准[J]. 北京交通大学学报,2010,34(3): 117-121. QI Zhenming, LI Pengfei. Control standard of ground surface settlements in metro section shallow tunnel[J]. Journal of Beijing Jiaotong University, 2010, 34(3): 117-121.
[8] 李进军,王卫东,黄茂松,等. 地铁盾构隧道穿越对建筑物桩基础的影响分析[J]. 岩土工程学报,2010,32(增刊2): 166-170. LI Jinjun, WANG Weidong, HUANG Maosong, et al. Influence of piles of structure induced by crossing tunnels[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(Sup.2): 166-170.
[9] 张顶立,黄俊. 地铁隧道施工拱顶下沉值的分析与预测[J]. 岩石力学与工程学报,2005,24(10): 1703-1707. ZHANG Dingli, HUANG Jun. Analysis and prediction of vault crown settlement in metro tunneling at shallow depth[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(10): 1703-1707.
[10] 刘泉声,白山云,肖春喜,等. 基于现场监控量测的龙潭隧道施工期围岩稳定性研究[J]. 岩石力学与工程学报,2007,26(10): 1982-1990. LIU Quansheng, BAI Shanyun, XIAO Chunxi, et al. Study on surrounding rock stability of Longtan tunnel based on in-situ monitoring measurements[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(10): 1982-1990.
[11] 张建斌. 厦门翔安海底隧道陆域段CRD法位移监测分析[J. 岩石力学与工程学报,2007,26(增刊2): 3653-3658. ZHANG Jianbin. Displacement monitoring analysis of Xiamen Xiang'an subsea tunnel in landside section constructed with CRD method[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(Sup.2): 3653-3658.
[12] 李二兵,王镝,王源,等. 城市复杂条件下浅埋大跨双连拱隧道施工变形监测与控制[J]. 岩石力学与工程学报,2007,26(4): 833-839. LI Erbing, WANG Di, WANG Yuan, et al. Monitoring and control of construction deformation of urban shallow-buried large-span double-arch tunnel under complex condition[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(4): 833-839.
[13] 袁勇,王胜辉,杜国平,等. 双连拱隧道支护体系现场监测试验研究[J]. 岩石力学与工程学报,2005,24(3): 480-484. YUAN Yong, WANG Shenghui, DU Guoping, et al. In-situ testing study on lining system of double-arched tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(3): 480-484.
[14] 中华人民共和国建设部. GB500072002 建筑地基基础设计规范[S]. 北京:中国建筑工业出版社,2002.
[15] 铁道第二勘察设计院. TB100032001/J1172001 铁路隧道设计规范[S]. 北京:中国铁道出版社,2001.
[16] 中铁二院工程集团有限责任公司. TB101212007/J7212007 铁路隧道监控量测技术规程[S]. 北京:中国铁道出版社,2007.
|